Skip to content

missing CIM/NC ontology terms used in Telemark-120 #417

@VladimirAlexiev

Description

@VladimirAlexiev

@EmilieSkog @ThomasRanvikEriksen

For easier management, I grouped terms and show a count:

Props. In some cases we also include links to online CIM documentation:

Classes

  • cim:Meter class

Enum values and Enumeration Classes (shown as "+1" below).

  • 3+1 cim:AccumulationKind (all are at IEC61968/Metering/AccumulationKind)
  • 1+1 cim:AggregateKind
  • 2+1 cim:AmiBillingReady
  • 1+1 cim:CommodityKind
  • 1+1 cim:ConnectionState
  • 1 cim:InUseStateKind.inUse. This is also used in Nordic44 but not defined?
  • 1 cim:MacroPeriodKind.sixtyMinute (not found on IEC61968/Metering/MacroPeriodKind?)
  • 3 cim:MeasurementKind (only last one found on IEC61968/Metering/MeasurementKind)
  • 1 cim:PotentialTransformerKind.capacitiveCoupling
  • 1 cim:RemoteUnitType.IED
  • 1 cim:TransformerControlMode.volt

@Sveino @griddigit-ci are there any plans to add such terms to CIM+NC?

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type
    No fields configured for issues without a type.

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions