Skip to content

Latest commit

 

History

History
17 lines (14 loc) · 1.41 KB

File metadata and controls

17 lines (14 loc) · 1.41 KB

Cronalytics Product Glossary

This document serves as the conceptual source of truth for technical terms before they are translated. All agents and translators must adhere to these definitions.

Term Technical Definition Usage in Dashboard Approved Phrasing (en)
Pace The ratio of (Actual Cost-Weighted Runs / Scheduled Cost-Weighted Runs) normalized to 30 days. Measures "Execution Rate vs Plan." Pace Modal, Leader Card Execution Rate / Pace
Job A recurring automated task defined in jobs.json. Table rows, detail view Job
Run A single execution of a Job, regardless of outcome (success/fail/retry). Counter badges, sparklines Run
Token The unit of LLM compute consumption. Token card, model breakdown Token
Wasted Estimated cost associated with failed (success=0) runs. Cost card, Modal Wasted
Nominal The target cost/usage if a job ran exactly according to its schedule. Pace Card, tooltips Nominal
Trend The projected 30-day cost/usage if current activity levels continue. Pace Card, tooltips Trend
Agent An autonomous LLM-driven session (requires agent: true in definition). Mode toggle, detail view Agent

Localization Overrides

When translating, if a model proposes a literal synonym (e.g. Pace -> Rhythm), the agent must override using the "Technical Context" from this table.