Skip to content

Latest commit

 

History

History
41 lines (39 loc) · 15.7 KB

File metadata and controls

41 lines (39 loc) · 15.7 KB

Phase Backlog

This backlog tracks scoped automation phases created from user input, screenshots, findings, automation summaries, GitHub validation results, and vendor observations.

Phase ID Input source Classification Proposed deliverable Risk lane Current status Depends on Validation required Notes
PHASE-001 User seed: rf IDEAS-style reader gap Credential/custody signal Credential Reader Signal Model using rf IDEAS-style reader patterns YELLOW Complete Phase Automation Orchestrator Typecheck, build, relevant proofs, unsafe-claim scan, phase gate Public-safe pattern only; no live integration, partnership, certification, or production support claim.
PHASE-002 User seed: LocknCharge/FUYL-shaped workflows Credential/custody signal Smart Locker Identity & Custody Signal Model using smart-locker check-in/check-out workflow patterns YELLOW Complete PHASE-001 or shared custody schema Typecheck, build, relevant proofs, unsafe-claim scan, phase gate Public-safe pattern only; no live integration or endorsement claim.
PHASE-003 Connector Emulator Smoke workflow passed with uploaded artifact Proof/scenario expansion Connector Emulator selected-group manual smoke runs documentation and evidence checklist GREEN Backlog Connector emulator harness and dashboard Connector emulator proof, artifact review notes, unsafe-claim scan Documents manual workflow usage without changing proof logic.
PHASE-004 Review Dashboard visual QA need UI/dashboard improvement Review Dashboard visual QA / screenshot capture strategy YELLOW Backlog Connector Emulator Review Dashboard Build, visual QA notes or screenshots, unsafe-claim scan Screenshot process only unless UI changes are explicitly scoped.
PHASE-005 Apple open-source platform strategy Platform strategy Apple-silicon local runner strategy GREEN Backlog Apple Open Source Platform Strategy Docs review, unsafe-claim scan Strategy documentation only; no runner deployment claim.
PHASE-006 GitHub Actions Node 20/Node 24 warning Maintenance GitHub Actions Node 24 maintenance cleanup YELLOW Backlog Current CI workflow inventory CI validation, build, proof suite Maintenance only; no validation weakening.
PHASE-007 Future manual full-product smoke screen Workflow automation Manual full-product smoke screen GREEN Complete Phase Automation Orchestrator Manual smoke checklist, full validation, unsafe-claim scan, phase gate Corrected push-triggered post-merge workflow evidence pass documented in docs/MANUAL_FULL_PRODUCT_SMOKE_SCREEN_RESULTS.md; manual workflow_dispatch evidence is reference-only.
PHASE-008 Future Apple management signal work Connector candidate Fixture-backed Apple ADE/ABM/Jamf/Intune signal modeling YELLOW Backlog Signal Source Catalog and Apple platform strategy Typecheck, build, relevant proofs, unsafe-claim scan Fixture-backed only; no live vendor calls.
PHASE-009 Future native shared-device work Platform strategy Native EnterpriseShell/shared-device assistant requirements GREEN Backlog Mobile/platform strategy and app suite plan Docs review, unsafe-claim scan Requirements only; no runtime support claim.
PHASE-010 User directive after PR #23 manual merge Credential/custody signal Credential Reader / Smart Locker Review Dashboard visualizing credential-reader scenarios YELLOW Complete PHASE-001, PHASE-002, connector emulator fixture Full validation, unsafe-claim scan, local QA screenshot/notes Merged in PR #24 and hardened by PR #25; public-safe visual dashboard only.
PHASE-011 User directive after PR #26 merge: current Connector Emulator Smoke evidence Workflow evidence / smoke-screen completion Current Connector Emulator Smoke workflow and artifact evidence pass for the manual full-product smoke screen GREEN Superseded by automation phase PR #26 merge, workflow available on default branch Current workflow run metadata, artifact metadata/review, full validation, unsafe-claim scan Manual owner action remained blocked by missing authenticated workflow-dispatch access in automation/chat environments; PHASE-019 removes that routine manual dependency.
PHASE-012 User screenshots: Intune lab setup Microsoft endpoint readiness Microsoft Endpoint Lab Readiness phase GREEN Backlog Phase Automation Orchestrator Docs review, unsafe-claim scan Parked for a future scoped phase; do not mix into current smoke evidence PR.
PHASE-013 User screenshots: Entra architecture Identity/governance signal Identity Fabric / Governance Signal Model phase YELLOW Backlog Signal source catalog Typecheck, build, relevant proofs, unsafe-claim scan Fixture-backed only; no live auth, tenant IDs, or directory integration.
PHASE-014 User screenshots: hospital 24x7 stack Healthcare demo narrative Healthcare demo narrative phase GREEN Backlog Public-safe demo narrative scope Docs review, unsafe-claim scan Narrative only; no PHI/PII, customer data, or production-readiness claim.
PHASE-015 User screenshots: Platform SSO during ADE Apple + Intune enrollment signal Apple + Intune Enrollment Signal phase YELLOW Backlog Apple management signal work Typecheck, build, relevant proofs, unsafe-claim scan Fixture-backed only; no live ADE, ABM, Intune, or device actions.
PHASE-016 User screenshots: Intune setup/admin guide Microsoft fixture expansion Microsoft fixture expansion phase YELLOW Backlog Microsoft Graph sandbox fixtures Typecheck, build, relevant proofs, unsafe-claim scan Public-safe fixtures only; no tenant IDs or live Microsoft Graph calls.
PHASE-017 User screenshots: Cisco ACI Network trust signal Network Trust / Segmentation Signal phase YELLOW Backlog Connector emulator network trust scenarios Typecheck, build, relevant proofs, unsafe-claim scan Public-safe network segmentation patterns only; no live vendor integration.
PHASE-018 User screenshots: PowerShell remediation Approval-gated remediation model Approval-gated Remediation Model phase YELLOW Backlog Simulator approval-gate guardrails Typecheck, build, simulator/proof coverage, unsafe-claim scan High-risk actions must remain simulated and approval-required; no unsupervised production remediation.
PHASE-019 User directive after PR #27 merge: remove manual workflow-dispatch dependency Workflow automation / smoke evidence automation Post-merge Connector Emulator Smoke evidence automation with generated evidence manifest YELLOW Complete PR #27 merge, Connector Emulator Smoke workflow Full validation, connector emulator proof, existing proof suite, phase gate, summary check, unsafe-claim scan, diff hygiene Runs automatically on pushes to SignalGrid_Alpha, defaults push runs to scenarioGroup=all, preserves manual selected-group dispatch, and uploads connector-emulator-smoke-evidence.
PHASE-020 User directive: Autopilot Control Plane Workflow automation / strategic packaging SignalGrid Autopilot Control Plane docs, evidence bot workflow, backlog curator, and buyer/partner readiness pack YELLOW Complete PHASE-019 post-merge smoke evidence automation Full validation, phase gate, summary check, phase PR report, backlog check, unsafe-claim scan Automation/reporting and strategic packaging only; no live integrations, secrets, tenant data, production readiness claim, partnership claim, or blind auto-merge.
PHASE-021 Parked theme: IAM market signals Buyer/partner thesis Strategic buyer and partner thesis phase GREEN Backlog Autopilot intake taxonomy Docs review, unsafe-claim scan, backlog check Parked for future pitch-material update from validated state only.
PHASE-022 Parked theme: Microsoft Endpoint / Intune lab readiness Signal source Microsoft Endpoint / Intune Lab Readiness phase GREEN Backlog Real-world testing readiness plan Docs review, unsafe-claim scan, backlog check No live tenant access or Microsoft Graph calls in Review Hub.
PHASE-023 Parked theme: Entra Identity Fabric / governance Identity/governance signal Entra Identity Fabric / Governance Signal Model phase YELLOW Backlog Signal Source Catalog Typecheck, build, relevant proofs, unsafe-claim scan Fixture-backed only; no live auth, tenant IDs, or directory writes.
PHASE-024 Parked theme: healthcare operating model Dashboard/demo improvement Healthcare operating-model demo narrative GREEN Backlog Buyer/partner readiness pack Docs review, unsafe-claim scan Narrative-only; no PHI/PII or customer data.
PHASE-025 Parked theme: Apple + Intune ADE / Platform SSO Connector candidate Apple + Intune ADE / Platform SSO enrollment signal model YELLOW Backlog Apple management signal backlog Typecheck, build, relevant proofs, unsafe-claim scan Fixture-backed only; no live ADE, ABM, Intune, or device actions.
PHASE-026 Parked theme: Cisco ACI segmentation Signal source Network Trust / Cisco ACI segmentation model YELLOW Backlog Connector emulator network trust scenarios Typecheck, build, relevant proofs, unsafe-claim scan Public-safe segmentation patterns only; no live network integration.
PHASE-027 Parked theme: approval-gated PowerShell remediation Workflow automation Approval-gated PowerShell remediation model YELLOW Backlog Simulator approval-gate guardrails Typecheck, build, simulator proofs, unsafe-claim scan High-risk action concepts must stay simulated and owner-approved.
PHASE-028 Parked theme: Apple on-device AI Platform strategy Apple on-device AI / local assistant strategy GREEN Backlog Mobile/platform strategy Docs review, unsafe-claim scan Strategy only; no local assistant runtime claim.
PHASE-029 User directive: Strategic Buyer / Partner Pitch Pack Buyer/partner thesis Strategic Buyer / Partner Pitch Pack, target categories, partnership/acquisition paths, and founder-control requirements GREEN Complete PHASE-020 Autopilot Control Plane and validated proof assets Full validation, unsafe-claim scan, backlog check, diff hygiene Docs-only pitch package from validated synthetic state; no live integrations, production readiness, valuation, partnership, certification, or transaction-outcome claims.
PHASE-030 User directive: Pitch Execution Pack from merged Strategic Buyer / Partner Pitch Pack Buyer/partner execution Pitch Execution Pack, executive one-pager, outreach templates, first-call talk track, partner demo script, and diligence checklist GREEN Complete PHASE-029 Strategic Buyer / Partner Pitch Pack Full validation, unsafe-claim scan, backlog check, diff hygiene Docs-only outbound-ready materials from validated synthetic state; no live integrations, production readiness, valuation, partnership, certification, legal, financial, acquisition, or replacement claims.
PHASE-031 User directive: Social Media Pre-Announcement Packet Public messaging / category-building Social Media Pre-Announcement Packet, LinkedIn post drafts, platform variants, visual concepts, and public messaging guardrails GREEN In progress (in review) PHASE-030 Pitch Execution Pack Full validation, unsafe-claim scan, backlog check, diff hygiene Pre-announcement/category-building only; docs-only; no launch, production readiness, customer, funding, valuation, certification, compliance, partnership, acquisition, replacement, live integration, or autonomous remediation claims.
PHASE-032 User directive: Level 10 Autopilot Completion Program Level 10 readiness Completion matrix, hands-off runbook, pitch/social/testing/company/category/demo packs, audit script, and workflow YELLOW Complete in this PR PHASE-020 Autopilot Control Plane, PHASE-029/030/031 readiness packs Full validation, level10 audit, unsafe-claim scan, backlog check, diff hygiene Public-safe packaging only; no live integrations, secrets, auth, tenant data, production readiness, certification, partnership, valuation, legal terms, replacement claim, or blind YELLOW/RED auto-merge.
PHASE-033 Follow-up from Level 10 matrix Review Hub UI/demo expansion Guided Level 10 dashboard rooms for executive overview, evidence, buyer/partner, founder strategy, social, and testing readiness YELLOW Backlog PHASE-032 Level 10 docs and owner UI priority Build, screenshot/local QA, proof suite, unsafe-claim scan UI implementation deferred to avoid sprawling this PR.
PHASE-034 Follow-up from Level 10 real-world testing pack Sandbox/design-partner scoping Private-context sandbox validation plan template and design-partner dry-run artifacts RED Backlog Owner approval, real-world testing readiness pack Docs review plus explicit owner approval before any private-context action Public repo may document requirements only; no secrets, tenant IDs, customer data, PHI/PII, live calls, or production writes.
PHASE-035 User directive after PR #34 merge: v0.2 investor/design-partner product foundation Product foundation roadmap SignalGrid v0.2 readiness plan, epic backlog, Microsoft connector first path, secure-tenancy foundation, pilot criteria, and product reality checklist GREEN Complete in this PR PHASE-032 Level 10 completion and PR #34 merge Full validation, Microsoft sandbox/connector proofs, phase checks, unsafe-claim scan, diff hygiene Roadmap/control-plan only; no pitch/social expansion, live integrations, secrets, customer data, production readiness, certification, partnership, valuation, legal, replacement, or autonomous remediation claims.