Skip to content

Latest commit

 

History

History
33 lines (26 loc) · 1.66 KB

File metadata and controls

33 lines (26 loc) · 1.66 KB

Best Widget Ever also known as: BWE

Project plan for BWE

Write and maingain both Functional Specifications and Technical Specifications.

###Referene: Original Link: https://doyouevenerp.com/functional-vs-technical-specifications/
Now at the Way Back Machine: https://web.archive.org/web/20220121192628/https://doyouevenerp.com/functional-vs-technical-specifications/

Folders:

  • firmware, holds firmware for BWE
  • parts, holds specifications for all parts for PCB and enclosure etc.
  • pcb, holds the schematic and PCB design files.
  • assembly, holds the folders and files for assembly of the PCB and the BWE.
  • testing, holds the test procedure and testing specifications for BWE.

This project milestones

  • Drawings for all parts in folders, electrical and mechanical

  • Update parts master to assign PartNumbers

  • Schematic release V0.0.1 for initial review

  • Review for manufacturing, testing, loading firmware, EMC, signal integerity, power distribution, safety, maximum temprature, ect...

  • Update Schematic release V0.0.2 etc...

  • Setup PCB software or train self for PCB manufacturing designe rules.

  • Schematic approved for start of PCB layout V0.1.xx

  • Enclosure design review. (Make card board mockup, Cable mock up. PCB mockup.)

  • Enclosure design freeze for prototype PCB. PCB outline and connector placement freeze.

  • PCB outline import parts and make and connector placement. Make mockup for fit to enclosure

  • Milestone: PCB mechanical fit test, (PCB mockup with connector fits enclosure with cables etc...)

  • Component placement for optimum routing and heat and Electromatnetic compatibility. Then route.

  • Review by fabricator of PCB against design rules.