Status: READY FOR ACTIVATION ✅ Date: 2026-01-30 GL Review: APPROVED WITH CONDITIONS - ALL RESOLVED
- 6/6 BDD test scenarios passing
- 1006/1006 baseline tests passing (with exclusions)
- Zero existing files modified
- All changes on feature branch
build/repo-cleanup-p0
- C1: 10 test files excluded, 1006 tests pass, 0 fail
- C2: Schedule corrected to 8 PM UTC (7 AM AEDT)
- C3: Force-with-lease implemented for safe rollback
- Review packet created (LifeOS spec v1.2.0)
- Handoff guide complete
- Conditions resolution documented
- Activation checklist (this file)
cd /mnt/c/Users/cabra/projects/LifeOS
git push -u origin build/repo-cleanup-p0Expected:
- 5 commits pushed successfully
- Branch visible on GitHub
Verify:
gh browse build/repo-cleanup-p0gh workflow run phase1_autonomy_nightly.yml --ref build/repo-cleanup-p0
gh run watchExpected Results:
- ✅ Checkout succeeds
- ✅ Python 3.11 installed
- ✅ Dependencies installed (pip + npm markdownlint)
- ✅ Doc hygiene runs (~13,150 issues found)
- ✅ Changes committed with robot attribution
- ✅ Pytest runs 1006 tests (all pass)
- ✅ No rollback triggered
- ✅ GitHub issue created
- ✅ Workflow status: Success ✅
If Workflow Fails:
- Check workflow logs:
gh run view <run-id> --log - Common issues:
- Markdownlint not installed → Check npm install step
- Tests fail → Verify test exclusions match
- Issue creation fails → Check permissions (issues: write)
gh issue list --label "phase-1" --limit 1
gh issue view <issue-number>Expected Issue Contents:
- ✅ Title: "📊 Phase 1 Autonomy Report - YYYY-MM-DD"
- ✅ Workflow metadata (time, status, run URL)
- ✅ Task results (✅ for doc hygiene, commit, pytest)
- ✅ Doc hygiene summary (~13,150 issues fixed)
- ✅ Test results summary (1006 passed)
- ✅ Review checklist
- ✅ Labels: automation, phase-1, nightly-run
Action:
- Review doc hygiene changes (check for false positives)
- Verify test results (1006 passed)
- Close issue after verification
gh pr create \
--title "Phase 1 Autonomy Implementation" \
--body "Closes Operating Model Phase 1 exit criteria.
## Summary
Implements automated doc hygiene with nightly autonomous execution:
- Doc hygiene script with 6/6 BDD tests passing
- Nightly workflow (8 PM UTC = 7 AM AEDT)
- Auto-commit + rollback on failure
- Morning reports via GitHub issues
## GL Review
- Verdict: APPROVED WITH CONDITIONS
- All 3 conditions (C1-C3) resolved ✅
## Documentation
- Review Packet: artifacts/review_packets/Review_Packet_Phase_1_Autonomy_Close_Operating_Model_v1.0.md
- Handoff Guide: PHASE1_HANDOFF.md
- Conditions Resolution: PHASE1_CONDITIONS_RESOLUTION.md
## Test Results
- Phase 1 tests: 6/6 passing ✅
- Baseline tests: 1006/1006 passing (with exclusions) ✅
- No regressions introduced ✅
## Next Steps After Merge
1. Monitor first scheduled run (~8 PM UTC tonight)
2. Review morning issue (~7 AM AEDT tomorrow)
3. Monitor 3 consecutive nights for stability
4. Mark Phase 1 COMPLETE if all AC15-AC19 pass
See PHASE1_HANDOFF.md for complete activation guide."Expected:
- PR created successfully
- CI runs on PR (pytest should pass)
Verify:
gh pr view
gh pr checks# After CI passes and manual review
gh pr merge --squashExpected:
- Squash merge to main
- Workflow now active on main branch
- First scheduled run tonight at 8 PM UTC
Verify:
gh workflow list
gh workflow view phase1_autonomy_nightly.ymlTimeline:
- Tonight 8:00 PM UTC - First scheduled run triggers
- Tonight 8:05 PM UTC - Execution completes
- Tomorrow 7:00 AM AEDT - Review issue
Monitoring:
# Tomorrow morning (7 AM AEDT)
gh issue list --label "phase-1" --limit 1
gh issue view <issue-number>Checklist:
- Issue created automatically
- Doc hygiene ran successfully
- Changes committed (if any)
- Tests passed (1006/1006)
- No rollback triggered
- Execution time < 5 minutes
- Review time < 10 minutes
Action:
- Review changes committed (trust linter for small fixes)
- Verify no false positives (manual spot check)
- Close issue
- Note: "Night 1 complete ✅"
Night 2 (Day N+1):
gh issue list --label "phase-1" --limit 1Expected:
- Fewer changes than Night 1 (convergence)
- Tests still passing
- Execution time consistent
Checklist:
- Issue created
- Convergence observed (fewer changes)
- Tests passed
- Close issue
- Note: "Night 2 complete ✅"
Night 3 (Day N+2):
gh issue list --label "phase-1" --limit 1Expected:
- Minimal or no changes (stabilization)
- Tests passing
- Execution time < 5 minutes
Checklist:
- Issue created
- Stabilization achieved (minimal changes)
- Tests passed
- Close issue
- Note: "Night 3 complete ✅"
After 3 Successful Nights:
Verify Final Acceptance Criteria:
- AC15: 3+ consecutive successful runs ✅
- AC16: 0 manual interventions during execution ✅
- AC17: 1006+ tests passing after each run ✅
- AC18: <5 minute average execution time ✅
- AC19: GL review time <10 minutes per morning ✅
Mark Complete:
# Create completion note
echo "Phase 1 Complete: $(date)" > PHASE1_COMPLETION.md
# Update Operating Model (if applicable)
# Document lessons learned
# Plan Phase 2 (PR workflow + OpenCode integration)Celebration:
- 🎉 First autonomous loop proven!
- 🎉 Doc hygiene on autopilot!
- 🎉 GL wakes to clean docs every morning!
If Workflow Consistently Fails:
gh workflow disable phase1_autonomy_nightly.ymlgit revert -m 1 <merge-commit-sha>
git push origin main- Identify issue in workflow logs
- Create fix on new branch
- Test with manual trigger
- Merge fix to main
| Criterion | Target | Status |
|---|---|---|
| Implementation | All code complete | ✅ |
| Testing | 6/6 BDD scenarios pass | ✅ |
| GL Review | Conditions C1-C3 resolved | ✅ |
| Push | Branch on GitHub | ⏳ |
| Manual Test | Workflow succeeds | ⏳ |
| PR | Created and merged | ⏳ |
| Night 1 | Issue + changes + tests pass | ⏳ |
| Night 2 | Convergence observed | ⏳ |
| Night 3 | Stabilization achieved | ⏳ |
| Phase 1 Exit | All AC1-AC19 met | ⏳ |
If Issues Arise:
- Check workflow logs:
gh run view <run-id> --log - Review PHASE1_CONDITIONS_RESOLUTION.md
- Consult PHASE1_HANDOFF.md troubleshooting section
- Check Review_Packet for detailed evidence
Phase 1 Owner: GL (marcusglee11) Implementation: Claude Sonnet 4.5 Review Date: 2026-01-30
Ready for activation! 🚀
Next action: Push branch and trigger manual workflow test.