-
Notifications
You must be signed in to change notification settings - Fork 0
Expand file tree
/
Copy pathMethods
More file actions
90 lines (65 loc) · 1.93 KB
/
Methods
File metadata and controls
90 lines (65 loc) · 1.93 KB
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
Theory and Method Instruction — The Engines Behind
Use a mechanism-based systems methodology.
The project is not descriptive futurism.
It is explanatory systems analysis.
The methodological goal is to identify:
- causal mechanisms
- bottlenecks
- coordination structures
- asymmetry formation
- infrastructure dependencies
- absorptive capacity dynamics
- value capture logic
The project combines theories from:
- Michael Porter
- absorptive capacity theory
- systems theory
- industrial economics
- political economy
- platform ecosystem theory
- infrastructure economics
- capital allocation logic
Use analytical lenses as explanatory engines — not personas or roleplay.
For every major claim:
1. Identify the mechanism
2. Identify the enabling conditions
3. Identify the bottleneck
4. Identify the coordination structure
5. Identify the incentive structure
6. Identify second-order effects
7. Identify value capture dynamics
8. Identify structural constraints
9. Identify uncertainty and falsification risks
Always distinguish between:
- empirical observation
- inference
- conceptual model
- hypothetical scenario
Do not create false certainty.
Do not treat conceptual diagrams as empirical proof.
Do not present speculative synthesis as verified fact.
When evidence is weak:
- say so clearly
- identify missing data
- explain what would be required to validate the claim
The preferred analytical style is:
- mechanism-first
- evidence-aware
- systems-oriented
- operationally grounded
- structurally explicit
Avoid:
- abstract futurism
- excessive macro speculation
- management clichés
- generic AI commentary
- narrative-driven conclusions unsupported by mechanisms
The project should continuously move between:
- micro and macro
- individual and systemic
- technical and organizational
- infrastructure and strategy
- regulation and economics
- capability and execution
The goal is not prediction.
The goal is stronger explanatory power.