Skip to content

Enhance control over task visibility #243

Description

@Darchie4

Currently a teacher can toggle visibility for at task manually, but not timed.

This might not have been a problem if not for the possibility for students to see the description of a task before they are able to actually start a task.

If a student opens a task, they have not yet started (before or after the start time) it shows this view:

Image

If the student then hit the "Close" button they will be able to see the text of the assignment (again even if it is before the start time)

Image

Metadata

Metadata

Assignees

No one assigned

    Type

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions