Skip to content

Latest commit

 

History

History
109 lines (72 loc) · 4.53 KB

File metadata and controls

109 lines (72 loc) · 4.53 KB

The Curtain Co Development Log



The Curtain Co App: thecurtainco.com.au
Front-End source code: FE Repo
Back-End source code: BE Repo

By Simon Curran and Phil Antiporda

Friday 20th November 2020

Monday 23rd November 2020

Tuesday 24th November 2020

Wednesday 25th November 2020

Thursday 26th November 2020

Friday 27th November 2020

Monday 30th November 2020

  • Second meeting with the client to discuss planning components (features, sitemap, wireframes, layout)
  • Initial presentation of wireframes to the client
  • Finalized MVP functionality/features
  • Documentation preparation

Tuesday 1st December 2020

  • Worked on mobile wireframes
  • Server auth and user CRUD actions
  • Refactoring according to client requirements
  • Documentation preparation

Wednesday 2nd December 2020

  • Worked on wireframes all day
  • Back-end admin/user roles researched and set up

Thursday 3rd December 2020

  • Had a colleague look over wireframes to check on double check design decisions

Friday 4th December 2020

  • Small updates to wireframes before final presentation to client

Saturday 5th December 2020

  • Front-end implementation plan started
  • Small updates to all wireframes after final presentation to client

Sunday 6th December 2020

Monday 7th December 2020


Authors

Simon Curran

Portfolio: simonmcurran.com
GitHub: SimoSultan
SimoSultan's GitHub
@simo_sultan's Twitter

Phil Antiporda

Portfolio: philantiporda.netlify.com
GitHub: philrussel21
phil's GitHub
@PeelRasel's Twitter