Skip to content

ci: Charter check failing at 'Install dependencies' — blocks PRs #22 + #27 #31

@stackbilt-admin

Description

@stackbilt-admin

Problem

Charter governance check on the CI workflow fails at the Install dependencies step on every open non-draft PR. Subsequent steps (Validate Commits, Drift Scan, ADF Wiring, ADF Evidence) are all skipped as a result.

Verified on two independent PRs (13 days apart, different content):

Both fail at the same step:

```
Set up job success
Run actions/checkout@v6 success
Run actions/setup-node@v6 success
Install dependencies FAILURE ← root cause
Validate Commits skipped
Drift Scan skipped
ADF Wiring & Pointer Integrity skipped
ADF Evidence skipped
Audit Report FAILURE ← downstream
```

Impact

Likely causes (to investigate)

  1. npm registry transient / lockfile version mismatch after recent setup-node v4→v6 bump (merged 2026-04-06, chore(ci): bump actions/checkout from 4 to 6 #12)
  2. Peer-dep change introduced by one of the dependabot-pinned packages
  3. Charter workflow-yaml pinning a Node version that no longer resolves a transitive dep

Fix path

Unblock plan

Once root cause identified: merge fix → rebase PR #22 (dependabot) → rebase PR #27 (cost_health). Do NOT red-merge either without fixing CI first (per `feedback_no_red_merge.md`).

Why now

Security debt on PR #22 is the forcing function. 8 open advisories × 13 days stale × no path to green CI = systemic hole, not a triage queue.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type
    No fields configured for issues without a type.

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions