Skip to content

fix!: support target_columns_to_types #20

fix!: support target_columns_to_types

fix!: support target_columns_to_types #20

Triggered via pull request August 25, 2025 18:21
Status Failure
Total duration 3m 23s
Artifacts

ci.workflow.yaml

on: pull_request
Integration Tests
2m 22s
Integration Tests
Matrix: Unit tests
Fit to window
Zoom out
Zoom in

Annotations

11 errors
Unit tests (3.9)
Process completed with exit code 2.
Unit tests (3.13)
The operation was canceled.
Unit tests (3.13)
The strategy configuration was canceled because "unit-tests._3_9" failed
Unit tests (3.12)
The operation was canceled.
Unit tests (3.12)
The strategy configuration was canceled because "unit-tests._3_9" failed
Unit tests (3.10)
The operation was canceled.
Unit tests (3.10)
The strategy configuration was canceled because "unit-tests._3_9" failed
Unit tests (3.11)
The operation was canceled.
Unit tests (3.11)
The strategy configuration was canceled because "unit-tests._3_9" failed
Integration Tests
The operation was canceled.
Integration Tests
Canceling since a higher priority waiting request for CI-9/merge-integration-tests exists