Skip to content

floonoc-sky130hd: routes to 6_final but fails PSM-0069 VSS connectivity on bazel-orfs 553c1c3 #202

Description

@mguthaus

Summary

The 2026-06 upgrade is a big step forward for floonoc-sky130hd — the old-tools 1_synth stall is gone and the flow now runs all the way to 6_final.odb. But the final report fails PSM-0069: Check connectivity failed on VSS — many TAP/FILLER/stdcell VGND pins are left unconnected by the default sky130hd PDN under the new tools (PSM-0039 warnings precede it).

Scope

Produces a routed DB but not a clean signoff. Needs a PDN fix (followpin/strap coverage of VSS, likely a pdn.tcl) — out of scope for the flow-knob upgrade. asap7 (+1114 ps) and nangate45 (+1838 ps) floonoc pass clean. See designs/src/floonoc/DECISIONS.md (sky130hd). Part of PR #195.

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Type

    No type

    Fields

    No fields configured for issues without a type.

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions