Skip to content

Latest commit

 

History

History
35 lines (30 loc) · 1.33 KB

File metadata and controls

35 lines (30 loc) · 1.33 KB

ShapeMaster Info Website - Work Breakdown Structure (WBS)

Phase 1: Planning & Design

  • Requirement Analysis (Done)
  • Technology Stack Validation (Done)
  • UI/UX Design Guide Definition (Done)
  • System Architecture Design (Done)

Phase 2: Asset Preparation

  • Generate 3D Hero Imagery (Done)
  • Generate App Mockup Mockups (Done)
  • Optimize and organize assets into website/assets/ (Done)

Phase 3: Core Development

  • Initialize website/style.css with Neo-Brutalism design tokens (Done)
  • Build website/index.html structure (Done)
  • Implement Hero Section (Done)
  • Implement Features Showcase (Done)
  • Implement How-To-Play Section (Done)
  • Implement responsive footer and navigation (Done)

Phase 4: Polish & Interactivity

  • Add scroll-triggered animations (Intersection Observer) (Done)
  • Implement hover states and micro-interactions (Done)
  • Ensure mobile responsiveness parity (Done)
  • SEO optimization (Meta tags, semantic HTML) (Done)

Phase 5: Review & Documentation

  • Performance audit
  • Accessibility check
  • Final handoff and README update (Done)
  • Create Privacy Policy and Terms of Service (Done)
  • Refine Footer Links (Done)
  • Create .gitignore and appropriate project files (Done)
  • Add Play Store download icons to website (Done)