Skip to content

chore: sync main into develop #6

chore: sync main into develop

chore: sync main into develop #6

Triggered via pull request February 3, 2026 17:35
Status Failure
Total duration 28s
Artifacts

ci.yml

on: pull_request
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
test (3.10)
Process completed with exit code 1.
test (3.11)
The strategy configuration was canceled because "test._3_10" failed
test (3.11)
The operation was canceled.
test (3.12)
The strategy configuration was canceled because "test._3_10" failed
test (3.12)
The operation was canceled.
test (3.9)
The strategy configuration was canceled because "test._3_10" failed
test (3.9)
The operation was canceled.