integration-tests #51
integration_test.yaml
on: schedule
Integration test using private-endpoint
/
Plan
7s
openstack interface test using private-endpoint
/
Plan
7s
Matrix: Integration test using private-endpoint / build
Matrix: openstack interface test using private-endpoint / build
Integration test using private-endpoint
/
Plan Image Scanning
0s
Matrix: Integration test using private-endpoint / Integration tests / Integration tests
Waiting for pending jobs
openstack interface test using private-endpoint
/
Plan Image Scanning
0s
Matrix: openstack interface test using private-endpoint / Integration tests / Integration tests
Waiting for pending jobs
Matrix: Integration test using private-endpoint / scan
Matrix: openstack interface test using private-endpoint / scan
Integration test using private-endpoint
/
Required Integration Test Status Checks
2s
openstack interface test using private-endpoint
/
Required Integration Test Status Checks
2s
allure-report
/
Publish Allure report
59s
Annotations
3 errors
|
Integration test using private-endpoint / Plan
Process completed with exit code 128.
|
|
openstack interface test using private-endpoint / Plan
Process completed with exit code 128.
|
|
allure-report / Publish Allure report
The process '/usr/bin/git' failed with exit code 1
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
2025-07-17T06-05-00-beb0__plan
Expired
|
298 Bytes |
sha256:2983d906a292e47a0cc44e6fd915d50d7e732ef896908896d3d92556ae86bacb
|
|
|
2025-07-17T06-05-01-8010__plan
Expired
|
298 Bytes |
sha256:95fb7a7c1e11b9b08f8d18f3995c47f12238b2bdb831f0b77a56f03c3be4b4f3
|
|