integration-tests #56
integration_test.yaml
on: schedule
Integration test using private-endpoint
/
Plan
7s
openstack interface test using private-endpoint
/
Plan
7s
Matrix: Integration test using private-endpoint / build
Matrix: openstack interface test using private-endpoint / build
Integration test using private-endpoint
/
Plan Image Scanning
0s
Matrix: Integration test using private-endpoint / Integration tests / Integration tests
Waiting for pending jobs
openstack interface test using private-endpoint
/
Plan Image Scanning
0s
Matrix: openstack interface test using private-endpoint / Integration tests / Integration tests
Waiting for pending jobs
Matrix: Integration test using private-endpoint / scan
Matrix: openstack interface test using private-endpoint / scan
Integration test using private-endpoint
/
Required Integration Test Status Checks
3s
openstack interface test using private-endpoint
/
Required Integration Test Status Checks
3s
allure-report
/
Publish Allure report
1m 0s
Annotations
3 errors
|
Integration test using private-endpoint / Plan
Process completed with exit code 128.
|
|
openstack interface test using private-endpoint / Plan
Process completed with exit code 128.
|
|
allure-report / Publish Allure report
The process '/usr/bin/git' failed with exit code 1
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
2025-07-19T18-04-06-84fd__plan
Expired
|
299 Bytes |
sha256:dbafc699939462b1c9a51bc526ef57c99efe8ade5f254ca3c54a56e28528b9ac
|
|
|
2025-07-19T18-04-07-8152__plan
Expired
|
298 Bytes |
sha256:11dfe952699ffe86b5029866c2927681d8f04df913cd21ba174d5de802c6a14e
|
|