Skip to content

integration-tests

integration-tests #104

Triggered via schedule August 12, 2025 18:04
Status Cancelled
Total duration 1d 3h 20m 57s
Artifacts 4

integration_test.yaml

on: schedule
Integration test using private-endpoint  /  Plan
6s
Integration test using private-endpoint / Plan
openstack interface test using private-endpoint  /  Plan
6s
openstack interface test using private-endpoint / Plan
Matrix: Integration test using private-endpoint / build
Matrix: openstack interface test using private-endpoint / build
Integration test using private-endpoint  /  Plan Image Scanning
3s
Integration test using private-endpoint / Plan Image Scanning
Matrix: Integration test using private-endpoint / Integration tests / Integration tests
openstack interface test using private-endpoint  /  Plan Image Scanning
3s
openstack interface test using private-endpoint / Plan Image Scanning
Matrix: openstack interface test using private-endpoint / Integration tests / Integration tests
Matrix: Integration test using private-endpoint / scan
Matrix: openstack interface test using private-endpoint / scan
Integration test using private-endpoint  /  Required Integration Test Status Checks
0s
Integration test using private-endpoint / Required Integration Test Status Checks
openstack interface test using private-endpoint  /  Required Integration Test Status Checks
0s
openstack interface test using private-endpoint / Required Integration Test Status Checks
allure-report  /  Publish Allure report
allure-report / Publish Allure report
Fit to window
Zoom out
Zoom in

Annotations

15 errors
openstack interface test using private-endpoint / Integration tests / Integration tests (test_runner_manager_openstack)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_metrics_failure)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_metrics_success)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_jobmanager_reactive)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_runner)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_fork_repo)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_fork_path_change)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_jobmanager_prespawned)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_reactive)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_upgrade)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_no_runner)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_debug_ssh)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists

Artifacts

Produced during runtime
Name Size Digest
2025-08-12T21-11-27-8a37__build__output__charm__github-runner Expired
28.7 MB
sha256:12d85e7513451886680d11641b2a8828560148ddecbf10c46563b3f8afdf6857
2025-08-12T21-11-27-8a37__plan Expired
298 Bytes
sha256:ed689a036f6f73c370251f56b530826ce7b2d706fac98dec7fee98558d36c2e3
2025-08-12T21-11-27-a9f5__build__output__charm__github-runner Expired
28.7 MB
sha256:fbd034c17ad51bc5a09fa37d80bd0abe16bc20f28b356e64e193aec2e133fa74
2025-08-12T21-11-27-a9f5__plan Expired
299 Bytes
sha256:0bf3687f70fbd8218705923a21447fccba0f2e28779967bf28d23737b5127a08