Skip to content

integration-tests

integration-tests #106

Triggered via schedule August 13, 2025 18:05
Status Cancelled
Total duration 1d 3h 37m 3s
Artifacts 4

integration_test.yaml

on: schedule
Integration test using private-endpoint  /  Plan
9s
Integration test using private-endpoint / Plan
openstack interface test using private-endpoint  /  Plan
8s
openstack interface test using private-endpoint / Plan
Matrix: Integration test using private-endpoint / build
Matrix: openstack interface test using private-endpoint / build
Integration test using private-endpoint  /  Plan Image Scanning
5s
Integration test using private-endpoint / Plan Image Scanning
Matrix: Integration test using private-endpoint / Integration tests / Integration tests
openstack interface test using private-endpoint  /  Plan Image Scanning
5s
openstack interface test using private-endpoint / Plan Image Scanning
Matrix: openstack interface test using private-endpoint / Integration tests / Integration tests
Matrix: Integration test using private-endpoint / scan
Matrix: openstack interface test using private-endpoint / scan
Integration test using private-endpoint  /  Required Integration Test Status Checks
0s
Integration test using private-endpoint / Required Integration Test Status Checks
openstack interface test using private-endpoint  /  Required Integration Test Status Checks
0s
openstack interface test using private-endpoint / Required Integration Test Status Checks
allure-report  /  Publish Allure report
allure-report / Publish Allure report
Fit to window
Zoom out
Zoom in

Annotations

15 errors
openstack interface test using private-endpoint / Integration tests / Integration tests (test_runner_manager_openstack)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_metrics_success)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_jobmanager_prespawned)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_metrics_failure)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_debug_ssh)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_no_runner)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_upgrade)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_runner)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_reactive)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_fork_repo)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_jobmanager_reactive)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_fork_path_change)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists

Artifacts

Produced during runtime
Name Size Digest
2025-08-13T21-25-40-bb59__build__output__charm__github-runner Expired
28.7 MB
sha256:aa8378ff8f0818b8890b9ee67042369ff33db8442c371a0d00e11ebf238bb348
2025-08-13T21-25-40-bb59__plan Expired
299 Bytes
sha256:fc7a4a1c20f45aa7a0720e80b08572ebafc4d69b76293345ee1e7e1b3ac71756
2025-08-13T21-25-42-8a1a__build__output__charm__github-runner Expired
28.7 MB
sha256:262425fdac85e45d30c68a4a72fe84849023cf8dd9d08f6c53ba64c46825ec49
2025-08-13T21-25-42-8a1a__plan Expired
298 Bytes
sha256:ea1c06e599e71bd921393b6399c993fa36e4a0250f80472d0198f139dc25c2c7