Skip to content

integration-tests

integration-tests #128

Triggered via schedule August 24, 2025 18:03
Status Cancelled
Total duration 1d 6h 12m 57s
Artifacts 4

integration_test.yaml

on: schedule
Integration test using private-endpoint  /  Plan
6s
Integration test using private-endpoint / Plan
openstack interface test using private-endpoint  /  Plan
6s
openstack interface test using private-endpoint / Plan
Matrix: Integration test using private-endpoint / build
Matrix: openstack interface test using private-endpoint / build
Integration test using private-endpoint  /  Plan Image Scanning
5s
Integration test using private-endpoint / Plan Image Scanning
Matrix: Integration test using private-endpoint / Integration tests / Integration tests
openstack interface test using private-endpoint  /  Plan Image Scanning
6s
openstack interface test using private-endpoint / Plan Image Scanning
Matrix: openstack interface test using private-endpoint / Integration tests / Integration tests
Matrix: Integration test using private-endpoint / scan
Matrix: openstack interface test using private-endpoint / scan
Integration test using private-endpoint  /  Required Integration Test Status Checks
0s
Integration test using private-endpoint / Required Integration Test Status Checks
openstack interface test using private-endpoint  /  Required Integration Test Status Checks
0s
openstack interface test using private-endpoint / Required Integration Test Status Checks
allure-report  /  Publish Allure report
allure-report / Publish Allure report
Fit to window
Zoom out
Zoom in

Annotations

15 errors
Integration test using private-endpoint / Integration tests / Integration tests (test_reactive)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_fork_repo)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_jobmanager_prespawned)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_debug_ssh)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_runner)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_metrics_success)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_metrics_failure)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_no_runner)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_fork_path_change)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_jobmanager_reactive)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_upgrade)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
openstack interface test using private-endpoint / Integration tests / Integration tests (test_runner_manager_openstack)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists

Artifacts

Produced during runtime
Name Size Digest
2025-08-25T00-02-44-8fa6__build__output__charm__github-runner Expired
28.7 MB
sha256:a801ba3668251317e51150fd8dcb292b27b9cfbf44cbd43e723a3be249802e08
2025-08-25T00-02-44-8fa6__plan Expired
298 Bytes
sha256:e5ab10e6538fa05c7f49b9dd32d463a1118c444d49bf8a1405e4b4d8db40d21e
2025-08-25T00-02-44-9b6e__build__output__charm__github-runner Expired
28.7 MB
sha256:ffb210f1e9e6be62764fc8da1f23e97d81cf20cacc82075506f0774c9ebabf3d
2025-08-25T00-02-44-9b6e__plan Expired
299 Bytes
sha256:4f1a66f953a0b6c5d44a7fbadd44e5530694be05beee1b0df52240cbfa24b4b8