Skip to content

integration-tests

integration-tests #161

Triggered via schedule March 5, 2026 06:10
Status Cancelled
Total duration 1d 11h 58m 16s
Artifacts 5

integration_test.yaml

on: schedule
Cross controller integration test using private-endpoint  /  Plan
7s
Cross controller integration test using private-endpoint / Plan
Integration test using private-endpoint  /  Plan
10s
Integration test using private-endpoint / Plan
Matrix: Runner tests across bases
Matrix: Cross controller integration test using private-endpoint / build
Matrix: Cross controller integration test using private-endpoint / Integration tests / Integration tests
Matrix: Integration test using private-endpoint / build
Matrix: Integration test using private-endpoint / Integration tests / Integration tests
Cross controller integration test using private-endpoint  /  Plan Image Scanning
Cross controller integration test using private-endpoint / Plan Image Scanning
Integration test using private-endpoint  /  Plan Image Scanning
0s
Integration test using private-endpoint / Plan Image Scanning
Matrix: Cross controller integration test using private-endpoint / scan
Matrix: Integration test using private-endpoint / scan
Cross controller integration test using private-endpoint  /  Required Integration Test Status Checks
Cross controller integration test using private-endpoint / Required Integration Test Status Checks
Integration test using private-endpoint  /  Required Integration Test Status Checks
0s
Integration test using private-endpoint / Required Integration Test Status Checks
allure-report  /  Publish Allure report
allure-report / Publish Allure report
Fit to window
Zoom out
Zoom in

Annotations

22 errors
Runner tests across bases (22.04) / Plan Image Scanning
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
Runner tests across bases (24.04) / Build charm (github-runner)
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
Runner tests across bases (24.04) / Build charm (github-runner)
The operation was canceled.
Integration test using private-endpoint / Build charm (github-runner)
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
Integration test using private-endpoint / Build charm (github-runner)
The operation was canceled.
Cross controller integration test using private-endpoint / Build charm (github-runner)
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
Runner tests across bases (24.04) / Integration tests / Integration tests (test_charm_runner)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Cross controller integration test using private-endpoint / Integration tests / Integration tests (test_prometheus_metrics)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Runner tests across bases (22.04) / Integration tests / Integration tests (test_charm_runner)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_no_runner)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_metrics_failure)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_metrics_success)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_fork_path_change)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_upgrade)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_multi_unit_same_machine)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_reactive)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists

Artifacts

Produced during runtime
Name Size Digest
2026-03-05T18-09-03-af99__plan
298 Bytes
sha256:37818f6aaf6e625f9812f3a67967f6dd1609ba25f3d1f319c2ce3537567e91ef
2026-03-05T18-09-04-be77__plan
299 Bytes
sha256:c9f8e9e069074c65e1f678e0e3661d8959c4109bf1bc065ed08206f1b74e1fee
2026-03-05T18-09-06-9b44__plan
299 Bytes
sha256:e6e3f357ce83f781dc5e2ade6d50435434f8a3bc0610e09f2dc432fafa672f5d
2026-03-05T18-09-06-9dd8__build__output__charm__github-runner
55.4 MB
sha256:7b1c43ccf42970bece2e74b018f0a836b36888ce68076eaa9cb03925748e4d77
2026-03-05T18-09-06-9dd8__plan
299 Bytes
sha256:cd04e91a95771058a4f0a7c35f14bca48b3b1e2eaa0b2f5d91430aaab72fd23c