Skip to content

integration-tests

integration-tests #169

Triggered via schedule March 9, 2026 06:15
Status Cancelled
Total duration 1d 11h 54m 21s
Artifacts 4

integration_test.yaml

on: schedule
Cross controller integration test using private-endpoint  /  Plan
10s
Cross controller integration test using private-endpoint / Plan
Integration test using private-endpoint  /  Plan
7s
Integration test using private-endpoint / Plan
Matrix: Runner tests across bases
Matrix: Cross controller integration test using private-endpoint / build
Matrix: Cross controller integration test using private-endpoint / Integration tests / Integration tests
Matrix: Integration test using private-endpoint / build
Matrix: Integration test using private-endpoint / Integration tests / Integration tests
Cross controller integration test using private-endpoint  /  Plan Image Scanning
Cross controller integration test using private-endpoint / Plan Image Scanning
Integration test using private-endpoint  /  Plan Image Scanning
0s
Integration test using private-endpoint / Plan Image Scanning
Matrix: Cross controller integration test using private-endpoint / scan
Matrix: Integration test using private-endpoint / scan
Cross controller integration test using private-endpoint  /  Required Integration Test Status Checks
Cross controller integration test using private-endpoint / Required Integration Test Status Checks
Integration test using private-endpoint  /  Required Integration Test Status Checks
0s
Integration test using private-endpoint / Required Integration Test Status Checks
allure-report  /  Publish Allure report
allure-report / Publish Allure report
Fit to window
Zoom out
Zoom in

Annotations

23 errors
Runner tests across bases (22.04) / Build charm (github-runner)
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
Runner tests across bases (22.04) / Build charm (github-runner)
The operation was canceled.
Integration test using private-endpoint / Build charm (github-runner)
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
Integration test using private-endpoint / Build charm (github-runner)
The operation was canceled.
Runner tests across bases (24.04) / Build charm (github-runner)
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
Runner tests across bases (24.04) / Build charm (github-runner)
The operation was canceled.
Cross controller integration test using private-endpoint / Build charm (github-runner)
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
Integration test using private-endpoint / Integration tests / Integration tests (test_reactive)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_metrics_failure)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_fork_path_change)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_multi_unit_same_machine)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_no_runner)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_upgrade)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_metrics_success)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Runner tests across bases (24.04) / Integration tests / Integration tests (test_charm_runner)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Runner tests across bases (22.04) / Integration tests / Integration tests (test_charm_runner)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
Cross controller integration test using private-endpoint / Integration tests / Integration tests (test_prometheus_metrics)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists

Artifacts

Produced during runtime
Name Size Digest
2026-03-09T18-09-59-89e2__plan
299 Bytes
sha256:f1d3636d655876666bc13451891bb891c514b1ac3863b35ef539977ff52d4ea4
2026-03-09T18-10-00-a377__plan
299 Bytes
sha256:4c75418dbfc443a6ad668d256e12c6c54b0ccdb37787ec18bad6c379327b90a4
2026-03-09T18-10-01-8fe5__plan
299 Bytes
sha256:90f8a4ba45fb0911db09225f7d35aaadbf5f02d8b83d4bd9461ac1be0e0a0397
2026-03-09T18-10-01-b15f__plan
299 Bytes
sha256:59cf360e924777592201c8cd00b96cd53a26e6601dab8587bad976747b250506