integration-tests #171
integration_test.yaml
on: schedule
Cross controller integration test using private-endpoint
/
Plan
7s
Integration test using private-endpoint
/
Plan
9s
Matrix: Runner tests across bases
Matrix: Cross controller integration test using private-endpoint / build
Matrix: Cross controller integration test using private-endpoint / Integration tests / Integration tests
Matrix: Integration test using private-endpoint / build
Matrix: Integration test using private-endpoint / Integration tests / Integration tests
Cross controller integration test using private-endpoint
/
Plan Image Scanning
0s
Integration test using private-endpoint
/
Plan Image Scanning
0s
Matrix: Cross controller integration test using private-endpoint / scan
Matrix: Integration test using private-endpoint / scan
Cross controller integration test using private-endpoint
/
Required Integration Test Status Checks
0s
Integration test using private-endpoint
/
Required Integration Test Status Checks
allure-report
/
Publish Allure report
Annotations
23 errors and 2 warnings
|
Runner tests across bases (24.04) / Build charm (github-runner)
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
|
|
Runner tests across bases (24.04) / Build charm (github-runner)
The operation was canceled.
|
|
Runner tests across bases (22.04) / Build charm (github-runner)
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
|
|
Runner tests across bases (22.04) / Build charm (github-runner)
The operation was canceled.
|
|
Integration test using private-endpoint / Build charm (github-runner)
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
|
|
Integration test using private-endpoint / Build charm (github-runner)
The operation was canceled.
|
|
Cross controller integration test using private-endpoint / Build charm (github-runner)
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
|
|
Cross controller integration test using private-endpoint / Build charm (github-runner)
The operation was canceled.
|
|
Runner tests across bases (24.04) / Integration tests / Integration tests (test_charm_runner)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|
|
Cross controller integration test using private-endpoint / Integration tests / Integration tests (test_prometheus_metrics)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|
|
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_metrics_failure)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|
|
Runner tests across bases (22.04) / Integration tests / Integration tests (test_charm_runner)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|
|
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_no_runner)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|
|
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_fork_path_change)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|
|
Integration test using private-endpoint / Integration tests / Integration tests (test_reactive)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|
|
Integration test using private-endpoint / Integration tests / Integration tests (test_multi_unit_same_machine)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|
|
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_upgrade)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|
|
Integration test using private-endpoint / Integration tests / Integration tests (test_charm_metrics_success)
The job has exceeded the maximum execution time while awaiting a runner for 24h0m0s
|
|
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
|
|
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
|
|
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
|
|
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
|
|
integration-tests
Canceling since a higher priority waiting request for integration-tests-refs/heads/main exists
|
|
Runner tests across bases (24.04) / Build charm (github-runner)
Unexpected input(s) 'rockcraft-ref', 'rockcraft-repository', valid inputs are ['build-plan', 'charmcraftcache', 'charmcraft-channel', 'github-token', 'rockcraft-channel']
|
|
Runner tests across bases (22.04) / Build charm (github-runner)
Unexpected input(s) 'rockcraft-ref', 'rockcraft-repository', valid inputs are ['build-plan', 'charmcraftcache', 'charmcraft-channel', 'github-token', 'rockcraft-channel']
|
Artifacts
Produced during runtime
| Name | Size | Digest | |
|---|---|---|---|
|
2026-03-10T18-10-12-903b__plan
|
299 Bytes |
sha256:5d5926dea2f335a59e04c4bdf35b9fd62269099c60d5611807c42514f9d37e0f
|
|
|
2026-03-10T18-10-13-8153__plan
|
298 Bytes |
sha256:2b61383b239e3b41b7fab4c2a5161631f4d5c486c1fb8e29b011b935533b7140
|
|
|
2026-03-10T18-10-14-ab24__plan
|
299 Bytes |
sha256:8d49e794387c5afc2cb28e5200b657abf735bb6ced365fc3a47a4f6499501429
|
|
|
2026-03-10T18-10-15-943c__plan
|
299 Bytes |
sha256:9e9989965059898f69214c086ee1e2e622fae1da3230c556bbb238f683844cda
|
|