Skip to content

Latest commit

 

History

History
93 lines (58 loc) · 5.33 KB

File metadata and controls

93 lines (58 loc) · 5.33 KB

Security Policy

cpp-critical-path-validator is used in production forensic delay analyses, EOT submissions, and expert-witness reports. Security defects — particularly any defect that could mislead a court — are treated as release-blocking.

Thank you for taking the time to report.


Supported versions

Version Supported
0.1.x Yes
< 0.1 No

The validator ships as cpp-critical-path-validator on GitHub. The most recent published version is always the supported reference; back-ports of security fixes to prior 0.1.x point releases are made on a best-effort basis.


Reporting a vulnerability

Do not open a public GitHub issue for a suspected vulnerability.

Email hello@criticalpathpartners.ca with the word SECURITY in the subject line. Include:

  • A description of the issue
  • A minimal reproduction (validator version, Python version, OS, snippet, input)
  • The forensic / operational impact you believe it has
  • Whether you intend to publicly disclose, and on what timeline

You should expect an initial acknowledgement within 72 hours. A confirmed vulnerability will receive a triage plan within 7 days and a fix or mitigation timeline shortly after.

We will credit reporters in the release notes unless you ask to remain anonymous.


What we consider a vulnerability

  • Forensic-correctness math bug that could mislead a court. Wrong critical-path identification, wrong CPLI / BEI / float-saturation computations, wrong constraint-driven-criticality classifications, missing or mis-fired LPM-confirmed-false-CP detections, DCMA-14 thresholds applied to the wrong profile, missing or wrong Daubert disclosures. The validator's whole value proposition is courtroom defensibility — these defects rank above conventional security bugs.
  • Information disclosure. Leakage of XER paths or contents through error messages, leakage of customer-supplied schedule data through caches or logs, file-enumeration through user input on the CLI.
  • Denial of service. Malformed XER inputs that exhaust memory or CPU, regex catastrophic-backtracking attacks against alert messages, infinite loops in the driving-path tracer on cyclic logic.
  • Supply-chain attack vectors. The validator ships zero third-party runtime dependencies in production — a vendored or transitive dependency appearing in CI is itself a finding. Build-time arbitrary code execution, post-install scripts, CI secret exfiltration are in scope. Drift between the bundled scripts/xer_parser.py and the canonical upstream in cpp-xer-parser (detected by the drift CI check) is also a finding.

What we do NOT consider a vulnerability

  • Performance degradation that does not affect correctness. "It got 12% slower on a 50,000-activity XER" is not a security issue. Open a normal performance bug.
  • Style / lint issues. Including pyflakes, black, and "best practice" complaints.
  • Citations that "could be worded better." Citation defects are handled through the regular issue template, not the security channel. Wrong, mis-attributed, or fabricated citations are release-blocking, but they are not security vulnerabilities.
  • The optional LPM cross-check unavailable when cpm module is absent. The validator gracefully degrades; the no-engine path is the documented behavior, not a security issue.
  • Theoretical attacks with no demonstrated reproduction against a current release.

Disclosure policy

We follow a 90-day coordinated-disclosure timeline:

  1. Day 0 — report received, reporter acknowledged within 72 hours.
  2. Day 0-7 — triage, severity assignment, fix plan.
  3. Day 7-60 — fix developed, tested against the full validator test suite plus any new regression test the reporter supplies.
  4. Day 60-90 — release coordinated with the reporter. Both sides agree a public-disclosure date.
  5. Day 90 — public disclosure (CHANGELOG entry, GitHub Security Advisory, optional CVE) regardless of whether all downstream consumers have upgraded. The validator is open-source; closed downstream consumers are responsible for their own patch windows.

If the issue is being actively exploited in the wild, we will compress the timeline and ship as soon as a fix is verified.


No bug-bounty program

We do not currently run a paid bug-bounty program. We will credit reporters in the release notes and on the project README. If your employer requires a bounty as a condition of disclosure, please email anyway and we can discuss.


Scope

In scope:

  • cpp-critical-path-validator source on GitHub
  • The bundled scripts/cp_validator.py, scripts/dcma14.py, scripts/validation.py, and scripts/config_profiles.py
  • The bundled scripts/xer_parser.py mirror, where the issue is a divergence from the canonical upstream (also report upstream against cpp-xer-parser)
  • criticalpathpartners.ca website to the extent it advertises validator behavior

Out of scope:

  • Third-party clones, forks, or re-distributions
  • The optional LPM cross-check feature when cpm module from cpp-cpm-engine is not on sys.path — this is documented graceful-degradation behavior
  • The closed CPP forensic skill suite — these have their own security channel; email hello@criticalpathpartners.ca and we will route.

Last updated: 2026-05-16.