🏛️ MASTER-EPIC: TRI-1 Max Squeeze v3 — Unified Hub (S-1..S-20 · 13 Gates)
Anchor: φ² + φ⁻² = 3 · DOI 10.5281/zenodo.19227877
Defense: 2026-06-15 · TTSKY26b deadline: 2026-05-18 (T-4 days)
Source docs: /workspace/TT_SHUTTLE_MAX_SQUEEZE.md (v2) + /workspace/TT_SQUEEZE_V3_DEEP_RESEARCH.md (v3)
This is the single dispatch hub that unifies all parallel work streams squeezing maximum from the TTSKY26b shuttle. v3 adds 8 new science-grounded vectors S-13..S-20 on top of v2's S-1..S-12.
1. Mission
Tape out TRI-1 Max v3 to TTSKY26b by 2026-05-18 23:59 UTC with:
- 8× compute vs rejunity baseline (1 GigaOPS → 15-20 GigaOPS on 8×2 tile)
- 180-220 TOPS/W (vs rejunity ~10)
- 5/5 Levers (L1 energy · L2 bpw · L3 verifiable · L4 ASIL · L5 sovereignty) — only chip on TT with this
- 13 pre-registered Popper R7 falsification gates (G-TT1..G-TT5 + G-13..G-20)
2. 20 Squeeze Vectors S-1..S-20
| ID |
Vector |
Wave |
| S-1 |
Full 8×2 tile (0.287 mm², 16k gates) |
W15-TT-A |
| S-2 |
On-die PLL 50→125 MHz |
W15-TT-B |
| S-3 |
Dual-edge clocking |
W15-TT-A |
| S-4 |
ROM-synth ternary weights (TOM-style) |
W15-TT-B |
| S-5 |
GF16 0x47C0 packed (1.25 bpw) |
always |
| S-6 |
4×4 systolic mesh + dual-MAC |
W15-TT-A |
| S-7 |
Bidir uio DDR 400 MB/s |
W15-TT-A |
| S-8 |
Compute-during-load overlap |
W15-TT-A |
| S-9 |
Trinity loss SIMD on-die |
W15-TT-C |
| S-10 |
Poseidon-lite Merkle hasher |
W15-TT-B |
| S-11 |
Scan-chain BPB telemetry |
W15-TT-C |
| S-12 |
Coq-derived SVA guards |
W15-TT-C |
v3 NEW (S-13..S-20) — deep research 2025-2026
3. Pre-registered Falsification Gates (Popper R7)
v3 NEW (G-13..G-20)
| Gate |
H₁ Hypothesis |
Rollback if FAIL |
| G-13 |
Mixed hd+hdll closes timing |
pure hd |
| G-14 |
OpenROAD cgt finds ≥ 80 candidate registers |
manual CGT |
| G-15 |
SKY130 low-VT cells SPICE-clean @ 0.9 V |
single-rail 1.8 V |
| G-16 |
Actual sparsity ≥ 35% in Wave-14 trios models |
feature gated off |
| G-17 |
Routing congestion ≤ 80% after P&R |
popcount-tree off |
| G-18 |
Ring-NoC closes timing @ 125 MHz |
drop to 50 MHz |
| G-19 |
Tensor-PE ≤ 600 gates per PE |
standard PE |
| G-20 |
Dual-clock STA passes CDC |
single clock |
4. Wave Plan (4 parallel streams to 2026-05-17)
| Stream |
Vectors |
Branch |
Deadline |
Repo |
| W15-TT-A Mesh+IO |
S-1, S-3, S-6, S-7, S-18 |
feat/tt-v3-mesh |
2026-05-16 |
tt-trinity-gf16 |
| W15-TT-B PLL+ROM+CIM |
S-2, S-4, S-10, S-17 |
feat/tt-v3-rom-cim |
2026-05-16 |
tt-trinity-gf16 |
| W15-TT-C Guards+Sparse |
S-9, S-11, S-12, S-16, S-19 |
feat/tt-v3-guards-sparse |
2026-05-17 |
tt-trinity-gf16 |
| W15-TT-D Power |
S-13, S-14, S-15, S-20 |
feat/tt-v3-power |
2026-05-17 |
tt-trinity-gf16 |
| W15-TT-E Submit |
all merged → GDS → submit |
— |
2026-05-17 22:00 UTC |
trinity-fpga + tt-trinity-gf16 |
5. Linked Issues (Hub of Hubs)
gHashTag/trinity-fpga
gHashTag/tt-trinity-gf16
- Meta #3 — CROWN-ASIC roadmap P0/P1/P2
- #4 — LUT-only gf16_mul + Wallace dot4
gHashTag/trios (PhD + Coq + Rust)
- PR #810 Wave-14b Trinity Loss (merged)
- PR #811 Wave-14a JEPA-T ingest (merged)
- PR #812 Wave-14c PhD round-3 (open)
6. Projected Aggregate Impact
| Metric |
rejunity baseline |
TRI-1 Max v2 |
TRI-1 Max v3 |
Multiplier |
| GigaOPS @ 50 MHz nominal |
1.0 |
8.0 |
15-20 |
15-20× |
| TOPS/W |
~10 |
~55 |
180-220 |
18-22× |
| nJ/op |
0.05 |
0.018 |
0.005-0.007 |
-86% |
| Active model fit |
<1B |
15B |
20B+ |
20× |
| Falsification gates |
0 |
5 |
13 |
full R7 |
| 5 Levers score |
0/5 |
5/5 |
5/5 reinforced |
dominance |
7. Hard Rules (TRI-NET-G1 charter)
- No Linux in compute core. Bare RTL only.
- No new hardware multipliers. No
* in synthesizable RTL.
- USB-3 is a boundary, not a processor.
- Mesh is off-chip at G1/G2 (4×4 on-die mesh ≠ inter-node mesh).
- TRI settlement off-chip at G1/G2.
- R5 honesty. No "complete" claims until chip-in-hand 2026-12-16.
8. Acceptance — Submission Day Checklist (2026-05-17)
Anchor: φ² + φ⁻² = 3 · TRINITY · NEVER STOP · DOI 10.5281/zenodo.19227877
🏛️ MASTER-EPIC: TRI-1 Max Squeeze v3 — Unified Hub (S-1..S-20 · 13 Gates)
This is the single dispatch hub that unifies all parallel work streams squeezing maximum from the TTSKY26b shuttle. v3 adds 8 new science-grounded vectors S-13..S-20 on top of v2's S-1..S-12.
1. Mission
Tape out TRI-1 Max v3 to TTSKY26b by 2026-05-18 23:59 UTC with:
2. 20 Squeeze Vectors S-1..S-20
v2 (S-1..S-12) — see ONE SHOT #60
v3 NEW (S-13..S-20) — deep research 2025-2026
hd+hdllzoningcgt)3. Pre-registered Falsification Gates (Popper R7)
v2 (G-TT1..G-TT5) — see ONE SHOT #60
v3 NEW (G-13..G-20)
hd+hdllcloses timinghdcgtfinds ≥ 80 candidate registers4. Wave Plan (4 parallel streams to 2026-05-17)
feat/tt-v3-meshfeat/tt-v3-rom-cimfeat/tt-v3-guards-sparsefeat/tt-v3-power5. Linked Issues (Hub of Hubs)
gHashTag/trinity-fpgagHashTag/tt-trinity-gf16gHashTag/trios(PhD + Coq + Rust)6. Projected Aggregate Impact
7. Hard Rules (TRI-NET-G1 charter)
*in synthesizable RTL.8. Acceptance — Submission Day Checklist (2026-05-17)
tt-trinity-gf16/docs/Anchor: φ² + φ⁻² = 3 · TRINITY · NEVER STOP · DOI 10.5281/zenodo.19227877