🧠 ONE SHOT — L-DPC23 QUANTUM BRAIN TURBO (TTSKY26b · S..X · T-48h)
Anchor: φ² + φ⁻² = 3 · DOI 10.5281/zenodo.19227877
Mission deadline: TTSKY26b 2026-05-18 22:00 UTC · T-48h
Mode: ⚡ AUTONOMOUS PARALLEL · многоагентный · sync через Throne (#93 + this issue)
Trigger phrase: "погнали L-DPC23" или "L-DPC23 lane S"
0. Why L-DPC23 — TTSKY26b Final Push
L-DPC22 уже посадил 4 lanes merged on main (K v2 + Q + R + RVR-027 NASA): 9-10 GigaOPS · 60-70 TOPS/W floor secured. Lane L (#5 stacked) и M v2 (80 MHz fallback) — в финальной CI стадии (~10-15 min до verdict).
L-DPC23 = 6 финальных усилителей перед W15-TT-E submit, привязанных к Quantum Brain 1:1 Silicon Mapping ребрендингу. Цели: max competitive moat + R7 falsification surface + defense-package completeness в одном спринте.
1. Mission
SHARPEN W15-TT-E submission через 6 параллельных streams (S..X) за T-48h до deadline.
Целевые метрики (за пределами L-DPC22 baseline):
- L-DPC22 floor: 9-10 GigaOPS · 60-70 TOPS/W @ 50 MHz
- L-DPC23 ceiling: 13-15 GigaOPS · 90-110 TOPS/W @ 80 MHz + Quantum Brain SKU lineup готов к Q3 ramp
2. 6 параллельных Streams (Lanes S..X)
| Lane |
Vector |
Branch |
Risk |
ETA |
| S |
S-30 — viewer fix (KLayout PNG) → unblocks viewer job sign-off |
feat/v15/s-viewer |
LOW |
2h |
| T |
S-31 — Quantum Brain top-level alias (tt_um_qbrain_maxtrue) + info.yaml branding |
feat/v15/t-qbrain-alias |
LOW |
2h |
| U |
S-32 — STA timing diagnostics dump + Razor FF stub (S-26 lite) for R7 evidence |
feat/v15/u-sta-razor |
MED |
5h |
| V |
S-33 — physical constant ROM verification (PHYS→SI mapping audit) |
feat/v15/v-phys-rom |
LOW |
3h |
| W |
S-34 — IGLA falsification appendix (3 broken-physics witnesses → R7 witness in defense pack) |
feat/v15/w-igla-falsif |
LOW |
4h |
| X |
S-35 — RVR-028 NASA T-24h final pre-submit verification report |
feat/v15/x-rvr028 |
LOW |
3h |
Hard rules (TRI-NET-G1 inherited)
- R-SI-1: NO new
* operators in RTL (legacy gf16_mul grandfathered)
- R5-HONEST: verification with session-fresh probes only
- R18 LAYER-FROZEN: no touches to frozen silicon hashes
- R8: Signoff Vasilev Dmitrii
<admin@t27.ai> on every commit
- No force push: only fast-forward +
--force-with-lease
- Apache-2.0 only
- NO-COMMIT-WITHOUT-ISSUE: Refs trinity-fpga#93 + new L-DPC23 issue
3. Quantum Brain anchoring (per stream)
Каждый lane обязан зацепить минимум один Quantum Brain axis:
| Axis |
Mapping |
Lane coverage |
| PHYS→SI |
physics constants в layout (φ, γ, π, c, G) |
V (ROM audit), W (falsif) |
| BIO→SI |
brain-module Quantum Brain primitives |
T (alias), U (Razor as biological redundancy) |
| LANG→SI |
TRI-27 ISA opcodes 0xD0..0xE0 |
T (info.yaml), V (constants table) |
R6 justification: «мутируй константу → синтез падает» — каждый PR должен show negative test (broken-constant probe failing GDS).
4. Falsification gates (R7 pre-registered)
| Gate |
Stream |
REJECT if |
ACCEPT if |
| G-30 |
S |
viewer.yml change breaks gds/precheck |
viewer ✅ on next run AND no GDS regression |
| G-31 |
T |
info.yaml top_module rename breaks TT precheck |
precheck ✅ AND backward-compat alias preserved |
| G-32 |
U |
Razor stub introduces $mul OR fails R-SI-1 yosys |
yosys clean AND STA report shows ≥10 paths with slack >0 |
| G-33 |
V |
physics constant value mutates anchor SHA256 |
TG-MAX-TRUE-X d3f9dd42...74aac2 preserved AND ROM audit table published |
| G-34 |
W |
falsification witness fails to break GDS (= not falsifiable) |
≥3 broken-physics witnesses cause measurable GDS regression |
| G-35 |
X |
RVR-028 has any FAIL probe |
10+ probes PASS, ≤1 AMBER, 0 FAIL |
5. Sync protocol (claim → progress → pass/fail)
Post in this issue (or #93):
- CLAIM:
🔒 CLAIM [L-DPC23-X] · agent=<id> · ETA <Nh> · branch <name>
- PROGRESS:
⏳ [L-DPC23-X] · <%> · current step: <ID>
- HANDOFF:
🆘 [L-DPC23-X] · STALLED at step <N> · need: <what>
- PASS:
✅ [L-DPC23-X] · PASS · commit <sha> · CI run <id>
- FAIL:
🔴 [L-DPC23-X] · FAIL · ICA-X-NNN: <root cause>
Trigger phrases
погнали L-DPC23 lane S — claim конкретный lane
L-DPC23 sync — pull статус всех 6
L-DPC23 freeze — emergency stop (≥2 lane FAIL)
6. Current baseline (verified · T-48h)
gHashTag/tt-trinity-max-true @ 1f3486b (main)
87a079d feat(crown): 24 SUPER-CROWN modules · 24-CROWN 8×4 GDS ✅
d952dcc docs(rvr-026): NASA mission report
c232ce4 docs(rvr-027): NASA T-50h checkpoint · WAVE-2/3/4 ledger
96672a9 feat(q-tvm): Lane Q TVM-VTA codegen stub
1f3486b feat(k-dual-lib): Lane K v2 timing-driven density (S-13 revised)
In flight: PR #5 (L stacked) + PR #4 (M v2 80 MHz fallback).
7. Active artifacts
- Repo:
gHashTag/tt-trinity-max-true @ 1f3486b
- L-DPC22 ONE SHOT: trinity-fpga#93
- EPIC: trinity-fpga#61
- Throne: trios#264
- Quantum Brain dossier:
QUANTUM_BRAIN_TTSKY26C_LINEUP_2026.md (261 lines)
- Anchor: TG-MAX-TRUE-X SHA256
d3f9dd42b2d891763bd6aa2c1974dbbf27f4d854b44ed497a58f6a749174aac2
- Deadline: W15-TT-E TTSKY26b · 2026-05-18T22:00:00Z (T-48h)
🧠 QUANTUM BRAIN 1:1 SILICON MAPPING · 🦟 NANO · 🐝 MID · 🦅 MAX-TRUE · 🌌 HOLOGRAPHIC
φ²+φ⁻²=3 · PHYS→SI · BIO→SI · LANG→SI · NEVER STOP
cc @gHashTag — L-DPC23 ready, агенты, разбирайте lanes S..X.
🧠 ONE SHOT — L-DPC23 QUANTUM BRAIN TURBO (TTSKY26b · S..X · T-48h)
0. Why L-DPC23 — TTSKY26b Final Push
L-DPC22 уже посадил 4 lanes merged on main (K v2 + Q + R + RVR-027 NASA): 9-10 GigaOPS · 60-70 TOPS/W floor secured. Lane L (#5 stacked) и M v2 (80 MHz fallback) — в финальной CI стадии (~10-15 min до verdict).
L-DPC23 = 6 финальных усилителей перед W15-TT-E submit, привязанных к Quantum Brain 1:1 Silicon Mapping ребрендингу. Цели: max competitive moat + R7 falsification surface + defense-package completeness в одном спринте.
1. Mission
SHARPEN W15-TT-E submission через 6 параллельных streams (S..X) за T-48h до deadline.
Целевые метрики (за пределами L-DPC22 baseline):
2. 6 параллельных Streams (Lanes S..X)
viewerjob sign-offfeat/v15/s-viewertt_um_qbrain_maxtrue) + info.yaml brandingfeat/v15/t-qbrain-aliasfeat/v15/u-sta-razorfeat/v15/v-phys-romfeat/v15/w-igla-falsiffeat/v15/x-rvr028Hard rules (TRI-NET-G1 inherited)
*operators in RTL (legacy gf16_mul grandfathered)<admin@t27.ai>on every commit--force-with-lease3. Quantum Brain anchoring (per stream)
Каждый lane обязан зацепить минимум один Quantum Brain axis:
R6 justification: «мутируй константу → синтез падает» — каждый PR должен show negative test (broken-constant probe failing GDS).
4. Falsification gates (R7 pre-registered)
d3f9dd42...74aac2preserved AND ROM audit table published5. Sync protocol (claim → progress → pass/fail)
Post in this issue (or #93):
🔒 CLAIM [L-DPC23-X] · agent=<id> · ETA <Nh> · branch <name>⏳ [L-DPC23-X] · <%> · current step: <ID>🆘 [L-DPC23-X] · STALLED at step <N> · need: <what>✅ [L-DPC23-X] · PASS · commit <sha> · CI run <id>🔴 [L-DPC23-X] · FAIL · ICA-X-NNN: <root cause>Trigger phrases
погнали L-DPC23 lane S— claim конкретный laneL-DPC23 sync— pull статус всех 6L-DPC23 freeze— emergency stop (≥2 lane FAIL)6. Current baseline (verified · T-48h)
In flight: PR #5 (L stacked) + PR #4 (M v2 80 MHz fallback).
7. Active artifacts
gHashTag/tt-trinity-max-true@1f3486bQUANTUM_BRAIN_TTSKY26C_LINEUP_2026.md(261 lines)d3f9dd42b2d891763bd6aa2c1974dbbf27f4d854b44ed497a58f6a749174aac2🧠 QUANTUM BRAIN 1:1 SILICON MAPPING · 🦟 NANO · 🐝 MID · 🦅 MAX-TRUE · 🌌 HOLOGRAPHIC
φ²+φ⁻²=3 · PHYS→SI · BIO→SI · LANG→SI · NEVER STOP
cc @gHashTag — L-DPC23 ready, агенты, разбирайте lanes S..X.