Skip to content

Latest commit

 

History

History
217 lines (149 loc) · 4.97 KB

File metadata and controls

217 lines (149 loc) · 4.97 KB

Project Status

Current Status

Version: 0.1.0 (Pre-release)
Status: Documentation Phase
Last Updated: 2025-12-02

Development Phases

✅ Phase 1: Documentation (Current)

  • Architecture documentation
  • Requirements specification
  • Workspace format specification
  • Database schema documentation
  • API documentation (HiveHub)
  • Development guide
  • User guide (pending)

⏳ Phase 2: Core Infrastructure (Planned)

  • Project setup (Electron + TypeScript + React)
  • Database initialization and schema
  • File system utilities
  • Basic UI framework
  • IPC communication setup

⏳ Phase 3: Project Management (Planned)

  • Project directory selection
  • Project list management
  • Project configuration UI
  • Project persistence

⏳ Phase 4: Workspace Export (Planned)

  • Workspace.yml generation
  • File scanning and filtering
  • Collection configuration
  • Export functionality

⏳ Phase 5: File Synchronization (Planned)

  • File system watcher
  • Change detection
  • Sync queue management
  • File upload/download
  • Conflict resolution

⏳ Phase 6: HiveHub Integration (Planned)

  • OAuth 2.0 authentication
  • API client implementation
  • Workspace management
  • File upload/download
  • Quota monitoring

⏳ Phase 7: Notification System (Planned)

  • Notification storage
  • Notification UI
  • System tray notifications
  • HiveHub notification integration

⏳ Phase 8: Configuration Management (Planned)

  • Settings UI
  • Configuration import/export
  • User preferences
  • Exclusion pattern management

⏳ Phase 9: Testing & Quality Assurance (Planned)

  • Unit tests (95%+ coverage)
  • Integration tests
  • E2E tests
  • Cross-platform testing
  • Performance testing

⏳ Phase 10: Release Preparation (Planned)

  • Code signing setup
  • Installer creation
  • Documentation finalization
  • Release notes
  • Beta testing

Completed Tasks

Documentation

  • ✅ Architecture documentation
  • ✅ Requirements specification
  • ✅ Workspace format specification (corrected to match Vectorizer format)
  • ✅ Database schema documentation
  • ✅ HiveHub API documentation
  • ✅ Development guide
  • ✅ README

In Progress

  • 📝 Finalizing documentation
  • 📝 Reviewing workspace format specification

Blocked

  • None currently

Known Issues

  • None currently (pre-development phase)

Next Steps

  1. Complete documentation review
  2. Set up project structure
  3. Initialize development environment
  4. Begin Phase 2: Core Infrastructure

Timeline

  • Q4 2025: Documentation and planning
  • Q1 2026: Core infrastructure and project management
  • Q2 2026: Workspace export and file synchronization
  • Q3 2026: HiveHub integration and notifications
  • Q4 2026: Testing, polish, and release

Dependencies

External Dependencies

  • Electron: Desktop application framework
  • React: UI framework
  • TypeScript: Type safety
  • SQLite (better-sqlite3): Local database
  • Chokidar: File system watching
  • YAML: Workspace.yml parsing/generation

Future Dependencies

  • OAuth 2.0 Client: HiveHub authentication
  • HTTP Client: HiveHub API communication

Risk Assessment

High Risk

  • HiveHub API Changes: API may change before implementation
    • Mitigation: Document API thoroughly, design for flexibility

Medium Risk

  • Cross-Platform Compatibility: File path handling differences

    • Mitigation: Use path utilities, test on all platforms
  • Performance: Large projects with many files

    • Mitigation: Implement batching, optimize database queries

Low Risk

  • SQLite Limitations: File size and concurrency
    • Mitigation: Use WAL mode, implement proper locking

Success Criteria

Phase 1 (Documentation)

  • ✅ All documentation complete and reviewed
  • ✅ Workspace format matches Vectorizer specification
  • ✅ Architecture is well-defined

Phase 2-4 (Core Features)

  • ✅ Users can select and manage projects
  • ✅ Workspace.yml files are exported correctly
  • ✅ File filtering works as specified

Phase 5-6 (Sync Features)

  • ✅ Files sync to HiveHub Cloud
  • ✅ File changes are detected and synced
  • ✅ Quota limits are respected

Phase 7-8 (Polish)

  • ✅ Notifications work correctly
  • ✅ Configuration can be imported/exported
  • ✅ Settings are persistent

Phase 9-10 (Release)

  • ✅ 95%+ test coverage
  • ✅ All tests pass on all platforms
  • ✅ Application is ready for beta release

Metrics

Code Quality

  • Target Test Coverage: 95%+
  • Target Lint Errors: 0
  • Target Type Errors: 0

Performance

  • File Change Detection: < 5 seconds
  • Database Queries: < 100ms
  • Application Startup: < 3 seconds
  • Memory Usage: < 500MB

User Experience

  • UI Responsiveness: No blocking operations
  • Error Messages: Clear and actionable
  • Documentation: Complete and up-to-date