Skip to content

Fix peer store management on channel closure #3346

Fix peer store management on channel closure

Fix peer store management on channel closure #3346

Triggered via pull request May 5, 2026 15:36
Status Failure
Total duration 13m 55s
Artifacts

rust.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

11 errors and 3 notices
build (ubuntu-latest, 1.85.0)
Process completed with exit code 101.
build (ubuntu-latest, beta)
The strategy configuration was canceled because "build.ubuntu-latest_1_85_0" failed
build (ubuntu-latest, beta)
The operation was canceled.
build (macos-latest, stable)
The strategy configuration was canceled because "build.ubuntu-latest_1_85_0" failed
build (macos-latest, stable)
The operation was canceled.
build (macos-latest, 1.85.0)
The strategy configuration was canceled because "build.ubuntu-latest_1_85_0" failed
build (macos-latest, 1.85.0)
The operation was canceled.
build (ubuntu-latest, stable)
The strategy configuration was canceled because "build.ubuntu-latest_1_85_0" failed
build (ubuntu-latest, stable)
The operation was canceled.
build (macos-latest, beta)
The strategy configuration was canceled because "build.ubuntu-latest_1_85_0" failed
build (macos-latest, beta)
The operation was canceled.
build (windows-latest, stable)
NOTICE: windows-2025 requests are being redirected to windows-2025-vs2026 by May 12, 2026
build (windows-latest, 1.85.0)
NOTICE: windows-2025 requests are being redirected to windows-2025-vs2026 by May 12, 2026
build (windows-latest, beta)
NOTICE: windows-2025 requests are being redirected to windows-2025-vs2026 by May 12, 2026