Skip to content

Latest commit

 

History

History
247 lines (175 loc) · 7.24 KB

File metadata and controls

247 lines (175 loc) · 7.24 KB

Solarpunk Utopia Platform - Implementation Status

Overview

This document tracks the implementation status of the Solarpunk Utopia Platform according to the roadmap defined in ROADMAP.md.

Last Updated: 2026-01-09

Phase I: Liberation Infrastructure

"Everything else depends on this"

The foundation of autonomy - offline-first, mesh networking, and surveillance-resistant infrastructure.

Group A: Offline-First Core ✅ COMPLETE

Feature Status Spec Reference
Local-first data storage ✅ Complete deployment-integration.md
Basic CRDT implementation ✅ Complete deployment-integration.md
Offline mode (full read/write) ✅ Complete deployment-integration.md
Data export (user sovereignty) ✅ Complete core-platform.md
End-to-end encryption ⏳ Phase II deployment-integration.md

Details: See platform/PHASE_1_INTEGRATION.md

Key Achievements:

  • IndexedDB-based local-first database
  • CRDT metadata with Last-Write-Wins resolution
  • Sync queue for offline operations
  • JSON export/import with auto-backup
  • Functional resource sharing demo

Group B: Mesh & Resilient Networking ⏳ Not Started

Feature Status Spec Reference
Meshtastic integration ⏳ Not Started deployment-integration.md
LoRa message relay ⏳ Not Started deployment-integration.md
WiFi Direct sync ⏳ Not Started deployment-integration.md
Bluetooth proximity sync ⏳ Not Started deployment-integration.md
Peer-to-peer synchronization ⏳ Not Started deployment-integration.md

Group C: Runs on Anything ✅ COMPLETE

Feature Status Spec Reference
Progressive Web App shell ✅ Complete deployment-integration.md
Termux installation package ✅ Complete deployment-integration.md
Minimal resource footprint ✅ Complete deployment-integration.md
Old phone support (Android 5+) ✅ Complete deployment-integration.md
Battery optimization ✅ Complete deployment-integration.md
Energy efficiency (solar charging) ✅ Complete deployment-integration.md

Details: See platform/PHASE_1_GROUP_C_COMPLETE.md

Bundle Size: 28.82 KB (94% under 500 KB target) ✅

Key Achievements:

  • Progressive Web App with offline support
  • Termux installation for old Android phones
  • Battery optimization with adaptive power modes
  • Zero runtime dependencies
  • ES5 compatible for Android 5.0+

Group D: Identity Without Surveillance ⏳ Not Started

Feature Status Spec Reference
Decentralized identifiers (DIDs) ⏳ Not Started deployment-integration.md
User-controlled reputation ⏳ Not Started core-platform.md
Privacy controls (opt-in everything) ⏳ Not Started core-platform.md
No phone number/email required ⏳ Not Started core-platform.md

Phase II: Trust Building - Quick Wins ⏳ Not Started

All groups pending - Phase I must complete first.

Phase III: Mutual Aid Coordination ⏳ Not Started

All groups pending.

Phase IV+: Future Phases ⏳ Not Started

See ROADMAP.md for complete roadmap.


Statistics

Overall Progress

  • Total Features Planned: 200+
  • Features Complete: 10
  • Phases Started: 1 of 16
  • Groups Complete: 2 of 60+

Phase I Progress

  • Group A: 4/5 features (80%) ✅ (E2E encryption moved to Phase II)
  • Group B: 0/5 features (0%)
  • Group C: 6/6 features (100%) ✅
  • Group D: 0/4 features (0%)
  • Phase I Total: 10/20 features (50%)

Liberation Impact

Completed Features Liberation Rating:

  • Progressive Web App shell: ✊✊✊✊ (4/5)
  • Termux installation: ✊✊✊✊✊ (5/5)
  • Minimal resource footprint: ✊✊✊✊✊ (5/5)
  • Old phone support: ✊✊✊✊✊ (5/5)
  • Battery optimization: ✊✊✊✊ (4/5)
  • Energy efficiency: ✊✊✊✊ (4/5)

Average Liberation: ✊✊✊✊✊ 4.5/5

Code Metrics

  • Bundle Size: 73.67 KB (85% under 500 KB target)
  • Lines of Code: ~3,500
  • Files: 20
  • Dependencies: 0 (runtime)
  • Browser Support: Android 5.0+ (2014)

Current Focus

Active: Phase I, Groups A & C - Integrated ✅

Next: Phase I, Group B - "Mesh & Resilient Networking"

Recommended implementation order:

  1. Meshtastic device detection and pairing
  2. LoRa message protocol adapter
  3. WiFi Direct peer discovery
  4. Bluetooth proximity sync
  5. Peer-to-peer sync protocol using CRDT

Testing Status

Phase I, Group C

Build Tests: ✅ Passing

  • Bundle size verification
  • Build system functional
  • All assets generated correctly

Manual Tests: ⏳ Pending

  • Real Android 5.0 device testing
  • 7-day solar charging test
  • Lighthouse audit
  • Accessibility audit
  • Network condition testing

Automated Tests: Not yet implemented

  • Unit tests (future)
  • Integration tests (future)
  • E2E tests (future)

How to Contribute

For Developers

  1. Review specifications in OpenSpec/specs/platform/
  2. Check this status document for incomplete features
  3. Follow the roadmap order (Phase I before Phase II, etc.)
  4. Use OpenSpec workflow for changes
  5. Test on low-resource devices

For Designers

  1. Review PWA at platform/src/public/index.html
  2. Create icon set for PWA (currently missing)
  3. Improve accessibility
  4. Test on old devices
  5. Maintain minimal bundle size

For Testers

  1. Review platform/TESTING.md
  2. Test on old Android devices
  3. Test solar charging scenarios
  4. Test offline functionality
  5. Report issues with environment details

Known Issues

  1. Icons Missing: PWA needs icon set (72px to 512px)
  2. No Real Device Tests: Needs testing on actual Android 5.0 device
  3. No Lighthouse Audit: Performance audit pending
  4. No Accessibility Audit: Screen reader testing needed

Recent Updates

2026-01-09: Phase I Integration - Groups A & C Complete

Morning: Completed Group C - "Runs on Anything"

  • Progressive Web App shell
  • Termux installation package
  • Minimal resource footprint
  • Old phone support (Android 5+)
  • Battery optimization
  • Energy efficiency

Afternoon: Integrated Group A - "Offline-First Core"

  • Local-first IndexedDB database
  • CRDT metadata with Last-Write-Wins
  • Sync queue for offline operations
  • Data export/import functionality
  • Functional resource sharing demo

Final Bundle: 73.67 KB (85% under 500 KB target)

Phase I Progress: 50% complete (10/20 features)

See:


Links


Building the new world in the shell of the old

Liberation infrastructure: In progress Community autonomy: Increasing Surveillance: Zero