Problem
The hybrid offshore wind system's cable nodes are incorrectly included in the electricity_production group, causing electricity from hybrid offshore wind to be counted twice in queries that sum all electricity production.
Root Cause
The following nodes are in the electricity_production group but should not be:
energy_power_hybrid_from_offshore_network_electricityenergy_power_hybrid_to_offshore_network_electricity
These nodes are transportation nodes that route electricity between the offshore network and onshore HV network for merit order purposes. They do not produce electricity themselves - they only pass through electricity already produced by energy_power_hybrid_wind_turbine_offshore or on land.
Impact
Queries that use V(G(electricity_production), output_of_electricity).sum (like total_electricity_produced) double-count hybrid offshore wind electricity:
- Once from the actual wind turbine
- Once from the passthrough node
This causes total_electricity_produced to be higher than the sum of carrier-based production queries, since carrier queries correctly filter by fuel input (e.g., wind_input_conversion > 0.0) and therefore exclude the passthrough nodes.
Solution
Remove electricity_production from the groups attribute in:
/graphs/energy/nodes/energy/energy_power_hybrid_from_offshore_network_electricity.ad/graphs/energy/nodes/energy/energy_power_hybrid_to_offshore_network_electricity.ad
We should verify that there is no fallout from removing these nodes from the group.