Skip to content
/ tep Public

Transmission expansion planning (TEP) model for the U.S. Western Interconnection. This model utilizes linear programming (LP) to optimize transmission line capacity additions by considering representative grid conditions in each month of a future year. This tool includes an embedded economic dispatch (ED) model to simulate grid operations.

License

Notifications You must be signed in to change notification settings

IMMM-SFA/tep

Folders and files

NameName
Last commit message
Last commit date

Latest commit

 

History

2 Commits
 
 
 
 
 
 
 
 
 
 
 
 

Repository files navigation

DOI

tep

Transmission expansion planning (TEP) model for the U.S. Western Interconnection. This model utilizes linear programming (LP) to optimize high voltage transmission line investment decisions by considering representative grid conditions in each month of a future year. This tool includes an embedded economic dispatch (ED) model to simulate grid operations. In order to initialize an electricity grid dataset for the TEP model, users need to create a future year scenario with Grid Operations (GO) modeling framework.

About

Transmission expansion planning (TEP) model for the U.S. Western Interconnection. This model utilizes linear programming (LP) to optimize transmission line capacity additions by considering representative grid conditions in each month of a future year. This tool includes an embedded economic dispatch (ED) model to simulate grid operations.

Resources

License

Stars

Watchers

Forks

Releases

No releases published

Packages

No packages published

Languages