-
Notifications
You must be signed in to change notification settings - Fork 0
All issues
Issue creation is restricted in this repository
Issues
is:issue state:open
is:issue state:open
Search results
test(mobile): verify the Android JDK-17 path from #315 on a machine with the toolchain
module: platformCross-cutting / repo-wide.Cross-cutting / repo-wide.priority: P2Nice-to-have / can slip to a later phase.Nice-to-have / can slip to a later phase.scope: mobileExpo mobile app.Expo mobile app.size: S~1 day.~1 day.type: choreMaintenance / non-feature work.Maintenance / non-feature work.Status: Open.#334 In Jaybhade/TheBrain;feat(mobile): show what was asked — question echo + session ask history
module: recallAsk verb / read path.Ask verb / read path.priority: P2Nice-to-have / can slip to a later phase.Nice-to-have / can slip to a later phase.scope: mobileExpo mobile app.Expo mobile app.size: M2–4 days.2–4 days.type: uxUser-facing affordance / interaction design.User-facing affordance / interaction design.Status: Open.#332 In Jaybhade/TheBrain;feat(mobile): one surface for capture and ask (no second screen)
module: recallAsk verb / read path.Ask verb / read path.priority: P1Important. Needed for the phase, but not blocking the loop.Important. Needed for the phase, but not blocking the loop.scope: mobileExpo mobile app.Expo mobile app.size: L~1 week.~1 week.type: featureNew capability.New capability.Status: Open.#331 In Jaybhade/TheBrain;feat(recall): real BM25 for the keyword doorway (ts_rank_cd is not BM25, despite the comment)
module: recallAsk verb / read path.Ask verb / read path.priority: P2Nice-to-have / can slip to a later phase.Nice-to-have / can slip to a later phase.scope: backendExpress API / server-side.Express API / server-side.size: L~1 week.~1 week.type: featureNew capability.New capability.Status: Open.#327 In Jaybhade/TheBrain;fix(recall): calibrate the §05.6 confidence bands per embedding model via the #257 eval gate
module: recallAsk verb / read path.Ask verb / read path.priority: P2Nice-to-have / can slip to a later phase.Nice-to-have / can slip to a later phase.scope: backendExpress API / server-side.Express API / server-side.size: M2–4 days.2–4 days.type: choreMaintenance / non-feature work.Maintenance / non-feature work.Status: Open.#326 In Jaybhade/TheBrain;test(mobile): verify the #318 token-refresh fix on-device + add a gesture-free capture seam
module: captureCapture verb / write path.Capture verb / write path.priority: P1Important. Needed for the phase, but not blocking the loop.Important. Needed for the phase, but not blocking the loop.scope: mobileExpo mobile app.Expo mobile app.size: M2–4 days.2–4 days.type: choreMaintenance / non-feature work.Maintenance / non-feature work.Status: Open.#324 In Jaybhade/TheBrain;feat(admin): stream ask responses (and keep the §13.5 citation guarantee)
module: recallAsk verb / read path.Ask verb / read path.priority: P2Nice-to-have / can slip to a later phase.Nice-to-have / can slip to a later phase.scope: backendExpress API / server-side.Express API / server-side.size: L~1 week.~1 week.type: featureNew capability.New capability.Status: Open.#322 In Jaybhade/TheBrain;feat(platform): self-hosted Langfuse v3 — LLM tracing, cost + latency analytics, eval scores
module: platformCross-cutting / repo-wide.Cross-cutting / repo-wide.priority: P2Nice-to-have / can slip to a later phase.Nice-to-have / can slip to a later phase.scope: infraCI, tooling, deployment.CI, tooling, deployment.size: XLMulti-week epic; expect to split.Multi-week epic; expect to split.status: in-progressPicked up, being workedPicked up, being workedtype: featureNew capability.New capability.Status: Open.#320 In Jaybhade/TheBrain;chore(docs): reconcile the stale Phase-1 roadmap in README with shipped work
module: platformCross-cutting / repo-wide.Cross-cutting / repo-wide.priority: P2Nice-to-have / can slip to a later phase.Nice-to-have / can slip to a later phase.scope: docsDocumentation / spec reconciliation.Documentation / spec reconciliation.size: S~1 day.~1 day.type: choreMaintenance / non-feature work.Maintenance / non-feature work.Status: Open.ux(admin): per-night consolidation health panel on the ops dashboard (§13.2)
module: adminAdmin/operator surface.Admin/operator surface.priority: P2Nice-to-have / can slip to a later phase.Nice-to-have / can slip to a later phase.scope: frontendAdmin (Next.js) UI.Admin (Next.js) UI.size: S~1 day.~1 day.type: featureNew capability.New capability.Status: Open.roadmap: Phase 1 exit-gate — the criteria that unlock Phase 2
module: platformCross-cutting / repo-wide.Cross-cutting / repo-wide.priority: P1Important. Needed for the phase, but not blocking the loop.Important. Needed for the phase, but not blocking the loop.scope: backendExpress API / server-side.Express API / server-side.size: M2–4 days.2–4 days.type: choreMaintenance / non-feature work.Maintenance / non-feature work.Status: Open.epic(admin): operator superadmin control plane — cross-user data, system config, logs & audit
module: adminAdmin/operator surface.Admin/operator surface.module: platformCross-cutting / repo-wide.Cross-cutting / repo-wide.priority: P2Nice-to-have / can slip to a later phase.Nice-to-have / can slip to a later phase.scope: backendExpress API / server-side.Express API / server-side.type: architectureArchitectural design or structural change.Architectural design or structural change.type: epicLarge multi-issue body of work.Large multi-issue body of work.Status: Open.