  • Critical path to the 1.0 freeze. Everything here must land BEFORE the freeze: it touches the public API or on-disk wire format, or is a remaining feature/example/doc on the 1.0 path. Merged from the former 'Feature-Complete' and 'Freeze Hardening' milestones — the 1/2 split was redundant (both were pre-freeze, with overlapping on-disk-format scope). Tier 0 = irreversible (on-disk format, stable-vs-nightly, per-row GlobalSeq); Tier 1 = breaking to change after external adoption. When this closes -> freeze -> build Agency.

    No due date
    44/52 issues closed
  • Standalone, additive, non-API-breaking cards that make nexus incrementally better. Worked on in parallel and after the freeze. Not on the critical path.

    Due by September 15, 2026
    1/12 issues closed
  • Features mature frameworks have. Expected for production adoption. Sagas, command routing, retry strategies, metadata enrichment, more store adapters.

    Due by August 1, 2026
    7/8 issues closed
  • Features every serious ES framework has. Without these, nexus cannot be used for real projects. Snapshots, projections, subscriptions, and test fixtures.

    Due by July 15, 2026
    12/12 issues closed
  • Exploratory evaluations and watch-list technologies (formal verification, simulation testing, loom). Not committed work.

    Due by November 1, 2026
    1/7 issues closed