Skip to content

Resources are not removed from queue, when timeout is reached#799

Draft
mPokornyETM wants to merge 5 commits intojenkinsci:masterfrom
mPokornyETM:bugfix-timeout-773
Draft

Resources are not removed from queue, when timeout is reached#799
mPokornyETM wants to merge 5 commits intojenkinsci:masterfrom
mPokornyETM:bugfix-timeout-773

Conversation

@mPokornyETM
Copy link
Contributor

fixed #773

Testing done

Proposed upgrade guidelines

N/A

Localizations

  • English
  • German
  • French
  • Slovak
  • Czech
  • ...

Submitter checklist

  • The Jira / Github issue, if it exists, is well-described.
  • The changelog entries and upgrade guidelines are appropriate for the audience affected by the change (users or developers, depending on the change) and are in the imperative mood (see examples).
    • The changelog generator for plugins uses the pull request title as the changelog entry.
    • Fill in the Proposed upgrade guidelines section only if there are breaking changes or changes that may require extra steps from users during the upgrade.
  • There is automated testing or an explanation that explains why this change has no tests.
  • New public functions for internal use only are annotated with @NoExternalUse. In case it is used by non java code the Used by {@code <panel>.jelly} Javadocs are annotated.
  • New or substantially changed JavaScript is not defined inline and does not call eval to ease the future introduction of Content Security Policy (CSP) directives (see documentation).
  • For dependency updates, there are links to external changelogs and, if possible, full differentials.
  • For new APIs and extension points, there is a link to at least one consumer.
  • Any localizations are transferred to *.properties files.
  • Changes in the interface are documented also as examples.

Maintainer checklist

Before the changes are marked as ready-for-merge:

  • There is at least one (1) approval for the pull request and no outstanding requests for change.
  • Conversations in the pull request are over, or it is explicit that a reviewer is not blocking the change.
  • Changelog entries in the pull request title and/or Proposed changelog entries are accurate, human-readable, and in the imperative mood.
  • Proper changelog labels are set so that the changelog can be generated automatically. See also release-drafter-labels.
  • If the change needs additional upgrade steps from users, the upgrade-guide-needed label is set and there is a Proposed upgrade guidelines section in the pull request title (see example).
  • java code changes are tested by automated test.

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

Resources are not removed from queue, when timeout is reached

1 participant