Milestones
List view
Non-breaking readiness wave: cost safety, multi-human security, delivery reliability, first-hour onboarding, and the docs/community files. Fourth of four — after this lands (plus fresh-VM install passes), the system is ready for users beyond the developer, whenever that moment comes.
No due date•0/25 issues closedThe surface breaks: template/lifecycle refactors (minds' copied src/), single API prefix, routable system events, and the external-connection docs written against the stabilized API. Third of four — needs mind-upgrade verification across every template.
No due date•0/6 issues closedThe schema-and-vocabulary breaks: user_type refactor, house/system split, terminology renames, Notes+Pages merge, plus removals approved by the compat inventory (#732). Second of four — breaking changes only, nothing else rides along.
No due date•0/4 issues closedMake breaking changes safe to ship: fix the migration history, prove upgrades in CI, and harden the update path itself. First of four release-readiness trains — everything schema-touching waits on this.
No due date•6/6 issues closedMake a new user's first hour work: no dead-ends, visible errors, and minds that show life out of the box.
No due date•16/16 issues closed- No due date•11/11 issues closed
- No due date•9/9 issues closed
- No due date•7/7 issues closed
- No due date•11/11 issues closed
- No due date•14/14 issues closed