Skip to content

8361726: Shenandoah: More detailed evacuation instrumentation#391

Open
earthling-amzn wants to merge 1 commit intoopenjdk:masterfrom
earthling-amzn:backport-8361726-to-25u-dev
Open

8361726: Shenandoah: More detailed evacuation instrumentation#391
earthling-amzn wants to merge 1 commit intoopenjdk:masterfrom
earthling-amzn:backport-8361726-to-25u-dev

Conversation

@earthling-amzn
Copy link

@earthling-amzn earthling-amzn commented Mar 14, 2026

Not clean. Conflicted with 68b27b88b5160dd2883f93928c5f6ce245412495, but not difficult to resolve.


Progress

  • Change must be properly reviewed (1 review required, with at least 1 Reviewer)
  • Change must not contain extraneous whitespace
  • JDK-8361726 needs maintainer approval
  • Commit message must refer to an issue

Issue

  • JDK-8361726: Shenandoah: More detailed evacuation instrumentation (Enhancement - P4)

Reviewing

Using git

Checkout this PR locally:
$ git fetch https://git.openjdk.org/jdk25u-dev.git pull/391/head:pull/391
$ git checkout pull/391

Update a local copy of the PR:
$ git checkout pull/391
$ git pull https://git.openjdk.org/jdk25u-dev.git pull/391/head

Using Skara CLI tools

Checkout this PR locally:
$ git pr checkout 391

View PR using the GUI difftool:
$ git pr show -t 391

Using diff file

Download this PR as a diff file:
https://git.openjdk.org/jdk25u-dev/pull/391.diff

Using Webrev

Link to Webrev Comment

@bridgekeeper
Copy link

bridgekeeper bot commented Mar 14, 2026

👋 Welcome back wkemper! A progress list of the required criteria for merging this PR into master will be added to the body of your pull request. There are additional pull request commands available for use with this pull request.

@openjdk
Copy link

openjdk bot commented Mar 14, 2026

❗ This change is not yet ready to be integrated.
See the Progress checklist in the description for automated requirements.

@openjdk openjdk bot changed the title Backport e756c0dbbb7d99df0751d71726b173e4eabcc903 8361726: Shenandoah: More detailed evacuation instrumentation Mar 14, 2026
@openjdk
Copy link

openjdk bot commented Mar 14, 2026

This backport pull request has now been updated with issue from the original commit.

@openjdk openjdk bot added backport Port of a pull request already in a different code base rfr Pull request is ready for review labels Mar 14, 2026
@mlbridge
Copy link

mlbridge bot commented Mar 14, 2026

Webrevs

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

backport Port of a pull request already in a different code base rfr Pull request is ready for review

Development

Successfully merging this pull request may close these issues.

1 participant