Croissant Bakery Production Simulation

A discrete-event simulation model of a small croissant bakery that models the complete croissant production process during a single 8-hour shift, including dough preparation, mixing, lamination, shaping, proofing, baking, resource allocation, and machine failures. The simulation was implemented in C++20 using the SIMLIB simulation library.


Project Overview

The goal of this project is to analyze the production workflow of a small bakery and identify bottlenecks, resource limitations, and opportunities for increasing production efficiency.

The simulation models:

  • Dough batch generation
  • Mixing process
  • Dough resting periods
  • Lamination
  • Shaping
  • Proofing
  • Baking
  • Baker workload distribution
  • Machine utilization
  • Machine failures and repairs

The model was designed to closely resemble a real-world bakery production process based on consultations with an experienced baker and publicly available production data.


Production Process

The production workflow consists of the following stages:

Dough Preparation
        ↓
      Mixing
        ↓
 Dough Resting #1
        ↓
    Lamination
        ↓
 Dough Resting #2
        ↓
     Shaping
        ↓
     Proofing
        ↓
      Baking
        ↓
     Cooling
        ↓
 Finished Croissants

The bakery operates with:

  • 3 bakers
  • 1 mixer
  • 1 laminating machine
  • 1 shaping machine
  • Proofing chamber
  • Oven
  • Refrigeration storage

Simulation Architecture

The simulator consists of:

  • Dough batch generator
  • Dough process entities
  • Tray process entities
  • Bakers modeled as resources
  • Machines modeled as facilities
  • Storage capacities
  • Machine failure generators
  • Repair processes

Each dough batch moves through the production chain until it is converted into trays containing shaped croissants.


Technologies

  • C++20
  • SIMLIB
  • GNU Make
  • g++

Project Structure

.
├── src/                    Source code implementation files
├── include/                Header files for the simulation components
├── docs/                   LaTeX documentation, diagrams and technical report
├── sim/                    Experiment parameter configuration and run script
├── lib/                    External dependencies (SIMLIB)
├── Makefile                Build configuration and compilation rules
└── README.md               Project documentation

Building the Project

Compile the simulation:

make

Run the simulation with default parameters:

make run

Or execute manually:

./simulation

Custom Configuration

Simulation parameters can be loaded from a CSV file:

./simulation parameters.csv

CSV format:

PARAMETER_NAME;VALUE

Example:

TRVANIE_SIMULACIE;480
DOBA_GENEROVANIA_NOVYCH_CIEST;75
INTERVAL_NOVEHO_CESTA;15
POCET_KUSOV_Z_JEDNEHO_CESTA;300

When a configuration file is supplied, its values override the defaults defined in parameters.hpp.


Experiments

Several experiments were performed to validate the model and evaluate production efficiency.

Experiment 1 — Production Time Analysis

Measured the production time of a single dough batch.

Results:

  • Average production time: ~275 minutes
  • Minimum: ~249 minutes
  • Maximum: ~292 minutes

Experiment 2 — Bottleneck Identification

Objective:

  • Identify the weakest point in the production line.

Result:

The shaping machine was identified as the primary bottleneck.

  • Average waiting time: ~70 minutes
  • Maximum waiting time: ~76 minutes

Experiment 3 — Resource Reduction

Objective:

  • Determine whether certain resources can be reduced without affecting output.

Resources successfully reduced:

  • Refrigerator capacity
  • Proofing chamber capacity
  • Oven capacity
  • Number of trays

Result:

Production remained unchanged.


Experiment 4 — Production Scaling

Objective:

  • Double production output.

Changes:

  • Double number of bakers
  • Double machine count
  • Increase oven capacity
  • Increase tray count

Result:

Production doubled from approximately 1500 to 3000 croissants per shift.


Experiment 5 — Mixer Failure

Simulated:

  • Random mixer breakdown
  • Repair duration ≈ 60 minutes

Result:

Production decreased due to discarded dough batches.


Experiment 6 — Laminator Failure

Simulated:

  • Random laminator breakdown
  • Repair duration ≈ 45 minutes

Result:

No significant impact on final production.


Experiment 7 — Shaping Machine Failure

Simulated:

  • Random shaping machine breakdown
  • Repair duration ≈ 25 minutes

Result:

Largest production loss among all tested failures.

  • Significant reduction in completed trays
  • Approximately 400 fewer croissants produced

Key Findings

  • The shaping machine is the primary production bottleneck.
  • Production of approximately 1500 croissants per shift is achievable with the baseline configuration.
  • Several resources can be reduced without affecting output.
  • Production can be doubled through proportional scaling of workers and equipment.
  • Failures of the shaping machine have the most severe impact on production.

License

This project is licensed under the MIT License. See the LICENSE file for details.

About

Simulation model for croissant bakery production

Topics

Resources

Stars

0 stars

Watchers

0 watching

Forks

Contributors

Languages