Austrian grid fees (Systemnutzungsentgelte) according to SNE-V, served as a static JSON API via GitHub Pages.
| Endpoint | Description |
|---|---|
/index.json |
Directory of all available amendments with metadata |
/v1/latest.json |
Current amendment (Novelle 2026) |
/v1/amendments/{id}.json |
Specific amendment (e.g. 2026, 2025, 2023_2) |
/v1/all.json |
All amendments in a single file |
2026, 2025, 2024, 2023_2, 2023_1, 2022, 2021, 2020, 2019, 2018, 2017, 2016, 2015
All monetary values are in cent/kW (Leistungspreis / demand charge) or cent/kWh (Arbeitspreis / energy charge).
Each amendment contains fees for network levels 1-7 (Netzebene 1-7), broken down by Austrian grid regions (Bundesland / Netzbetreiber).
| Level | Description |
|---|---|
| NE1 | Extra-high voltage (220/380 kV) |
| NE2 | Transformation extra-high/high voltage |
| NE3 | High voltage (110 kV) |
| NE4 | Transformation high/medium voltage |
| NE5 | Medium voltage (1-36 kV) |
| NE6 | Transformation medium/low voltage |
| NE7 | Low voltage (0.4 kV) - metered, non-metered, interruptible |
| Code | Period |
|---|---|
| SHT | Summer high tariff (Apr-Sep, 06:00-22:00) |
| SNT | Summer low tariff (Apr-Sep, 22:00-06:00) |
| WHT | Winter high tariff (Oct-Mar, 06:00-22:00) |
| WNT | Winter low tariff (Oct-Mar, 22:00-06:00) |
E-Control Austria - SNE-V (Systemnutzungsentgelte-Verordnung) amendments published in the Austrian Federal Law Gazette (Bundesgesetzblatt).
To regenerate the JSON files from the Excel source:
pip install openpyxl
python3 scripts/build.py