Skip to content

Milestones

List view

  • Feature release after the v0.4.5 follow-up line: real Claude Code/OpenCode plugin-store installation proof (#390), profile-first bounded parallel indexing and graph construction (#358), and entrypoint-aware repository dead-code profiles (#384), with deterministic behavior, bounded resources, and accumulated release gates.

    No due date
    0/5 issues closed
  • Post-v0.5.0 navigation-performance maintenance. Evaluate and, only after exact output-equivalence plus measured benefit, replace legacy reverse-caller scans (#342). Preserve the authoritative compatibility path and accumulated release gates.

    No due date
    0/1 issues closed
  • Single-issue v0.4.4 transparency release for #439: keep the accepted token-impact TUI, use the 50% folder-scope policy for the primary average tokens avoided, retain the current all-files calculation as the visible maximum, and stack the complete average and maximum equations. No other issue or pull-request scope.

    No due date
    5/5 issues closed
  • Bugfix-only stabilization release for the complete live type:bug inventory. No feature work or routine dependency upgrades.

    No due date
    12/12 issues closed
  • Bugfix-only stabilization release for ProjectAtlas v0.4. Scope is limited to confirmed regressions, compatibility, data-integrity, cancellation/deadline, installer or packaged-host fixes, plus one consolidated README/About clarity update. No features, TUI redesigns, performance initiatives, Memory Atlas work, or routine dependency upgrades. Subsequent v0.4.x releases remain bugfix-only until the v0.4 line is demonstrably stable.

    No due date
    25/25 issues closed
  • Maintenance batch for post-v0.3.25 dependency and workflow hygiene.

    No due date
    5/5 issues closed
  • Next ProjectAtlas follow-up after the v0.3.20 multi-project MCP routing release.

    No due date
    3/3 issues closed
  • ProjectAtlas v0.3.20 release for MCP multi-project routing, active project selection, per-call project_path overrides, and strict string-contract linting.

    No due date
    2/2 issues closed
  • Follow-up fixes from the full GitHub Codex review-comment audit after v0.3.18.

    No due date
    11/11 issues closed
  • No due date
    3/3 issues closed
  • Follow-up tracking for post-v0.3.15 smoke findings and upstream plugin compatibility warnings.

    No due date
    9/9 issues closed
  • No due date
    5/5 issues closed
  • Post-v0.3.12 purpose quality and parser follow-up work.

    No due date
    7/7 issues closed