-
Notifications
You must be signed in to change notification settings - Fork 6.1k
Pull requests: pingcap/tidb
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
test: stabilize Denotes a PR that doesn't merit a release note.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
TestStalenessAndHistoryRead
release-note-none
#65622
opened Jan 17, 2026 by
tangenta
Loading…
2 of 13 tasks
planner, meta: [WIP] | tidb-test=pr/2663
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#65620
opened Jan 16, 2026 by
time-and-fate
Loading…
1 of 13 tasks
planner: fix flaky tests in instanceplancache package
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#65619
opened Jan 16, 2026 by
fixdb
Loading…
1 of 12 tasks
DO NOT MERGE POC: feat: support load table info on demand for cross sessions
do-not-merge/needs-linked-issue
do-not-merge/needs-tests-checked
release-note-none
Denotes a PR that doesn't merit a release note.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#65618
opened Jan 16, 2026 by
0xPoe
Loading…
13 tasks
metrics: fix typo in tidb_summary.jsonnet template variable (#65582)
approved
contribution
This PR is from a community contributor.
do-not-merge/cherry-pick-not-approved
first-time-contributor
Indicates that the PR was contributed by an external member and is a first-time contributor.
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
type/cherry-pick-for-release-6.5
This PR is cherry-picked to release-6.5 from a source PR.
#65617
opened Jan 16, 2026 by
ti-chi-bot
Loading…
2 of 13 tasks
metrics: fix typo in tidb_summary.jsonnet template variable (#65582)
approved
contribution
This PR is from a community contributor.
do-not-merge/cherry-pick-not-approved
first-time-contributor
Indicates that the PR was contributed by an external member and is a first-time contributor.
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
type/cherry-pick-for-release-6.1
This PR is cherry-picked to release-6.1 from a source PR.
#65616
opened Jan 16, 2026 by
ti-chi-bot
Loading…
2 of 13 tasks
metrics: fix typo in tidb_summary.jsonnet template variable (#65582)
approved
contribution
This PR is from a community contributor.
do-not-merge/cherry-pick-not-approved
first-time-contributor
Indicates that the PR was contributed by an external member and is a first-time contributor.
lgtm
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
type/cherry-pick-for-release-8.5
This PR is cherry-picked to release-8.5 from a source PR.
#65615
opened Jan 16, 2026 by
ti-chi-bot
Loading…
2 of 13 tasks
metrics: fix typo in tidb_summary.jsonnet template variable (#65582)
approved
contribution
This PR is from a community contributor.
do-not-merge/cherry-pick-not-approved
first-time-contributor
Indicates that the PR was contributed by an external member and is a first-time contributor.
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
type/cherry-pick-for-release-8.1
This PR is cherry-picked to release-8.1 from a source PR.
#65614
opened Jan 16, 2026 by
ti-chi-bot
Loading…
2 of 13 tasks
metrics: fix typo in tidb_summary.jsonnet template variable (#65582)
approved
contribution
This PR is from a community contributor.
do-not-merge/cherry-pick-not-approved
first-time-contributor
Indicates that the PR was contributed by an external member and is a first-time contributor.
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
type/cherry-pick-for-release-7.5
This PR is cherry-picked to release-7.5 from a source PR.
#65613
opened Jan 16, 2026 by
ti-chi-bot
Loading…
2 of 13 tasks
metrics: fix typo in tidb_summary.jsonnet template variable (#65582)
approved
contribution
This PR is from a community contributor.
do-not-merge/cherry-pick-not-approved
first-time-contributor
Indicates that the PR was contributed by an external member and is a first-time contributor.
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
type/cherry-pick-for-release-7.1
This PR is cherry-picked to release-7.1 from a source PR.
#65612
opened Jan 16, 2026 by
ti-chi-bot
Loading…
2 of 13 tasks
[wip]objstore: support use native OSS sdk to access
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
conn: fix the issue that the connection count for resource group is not correctly tracked for Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
ComUserChange and ComReset
release-note-none
#65607
opened Jan 16, 2026 by
YangKeao
Loading…
1 of 13 tasks
*: support column masking (WIP)
do-not-merge/needs-linked-issue
do-not-merge/needs-tests-checked
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#65603
opened Jan 16, 2026 by
tiancaiamao
•
Draft
13 tasks
*: speed up unit tests and fix flakes
component/statistics
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
sig/planner
SIG: Planner
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#65601
opened Jan 16, 2026 by
wjhuang2016
Loading…
4 of 13 tasks
executor: accerelate some unit tests for spill tests
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#65599
opened Jan 16, 2026 by
xzhangxian1008
Loading…
1 of 13 tasks
pkg/ddl: loose the pre-check for temporary table.
lgtm
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
sig/planner
SIG: Planner
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#65598
opened Jan 15, 2026 by
bb7133
Loading…
2 of 6 tasks
executor: return proper error for LOAD DATA with AUTO_RANDOM column
approved
contribution
This PR is from a community contributor.
do-not-merge/needs-triage-completed
first-time-contributor
Indicates that the PR was contributed by an external member and is a first-time contributor.
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
ok-to-test
Indicates a PR is ready to be tested.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
skip-issue-check
Indicates that a PR no need to check linked issue.
#65597
opened Jan 15, 2026 by
Milad93R
Loading…
1 of 13 tasks
pkg/executor: optimize slow log reading and parsing performance
contribution
This PR is from a community contributor.
ok-to-test
Indicates a PR is ready to be tested.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#65596
opened Jan 15, 2026 by
shenyv1
Loading…
2 of 12 tasks
table: extend 'Table has no partition for value' error message to include the value
contribution
This PR is from a community contributor.
do-not-merge/needs-tests-checked
do-not-merge/release-note-label-needed
Indicates that a PR should not merge because it's missing one of the release note labels.
needs-ok-to-test
Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#65595
opened Jan 15, 2026 by
GlobalStar117
Loading…
config: fix UpdateGlobal function comment
contribution
This PR is from a community contributor.
do-not-merge/needs-tests-checked
do-not-merge/release-note-label-needed
Indicates that a PR should not merge because it's missing one of the release note labels.
needs-ok-to-test
Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#65594
opened Jan 15, 2026 by
GlobalStar117
Loading…
expression: implement UUID_SHORT() function
contribution
This PR is from a community contributor.
do-not-merge/needs-tests-checked
do-not-merge/needs-triage-completed
do-not-merge/release-note-label-needed
Indicates that a PR should not merge because it's missing one of the release note labels.
first-time-contributor
Indicates that the PR was contributed by an external member and is a first-time contributor.
needs-ok-to-test
Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#65593
opened Jan 15, 2026 by
GlobalStar117
Loading…
domain/affinity: update pd client for api
do-not-merge/needs-linked-issue
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
ddl: add owner tenure metric and panel
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#65590
opened Jan 15, 2026 by
fzzf678
Loading…
1 of 13 tasks
executor: fix panic when LOAD DATA with AUTO_RANDOM column without allow_auto_random_explicit_insert
contribution
This PR is from a community contributor.
do-not-merge/needs-triage-completed
first-time-contributor
Indicates that the PR was contributed by an external member and is a first-time contributor.
ok-to-test
Indicates a PR is ready to be tested.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#65588
opened Jan 15, 2026 by
0xsid0703
Loading…
1 of 12 tasks
WIP: statistics: persist stats delta init time
component/statistics
do-not-merge/needs-triage-completed
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
sig/planner
SIG: Planner
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#65586
opened Jan 15, 2026 by
0xPoe
Loading…
1 of 13 tasks
Previous Next
ProTip!
Follow long discussions with comments:>50.